Table of Contents
Figure 1: Front and Right-Side Panels
Figure 2: Front Panel and Touchscreen
Figure 4: Stainer Bowl Components
1.3 Touchscreen and User Interface
Section 2: Setup and Preparation for Operation
Unpacking and Installing the Stainer
Connecting the Drain Tube and Waste Container
Installing Standard 500 mL Reagent Bottles for the First Time
Preparing the Stainer for Operation
Section 3: Controlling and Customizing Stainer Functions
Accessing the System Setup Menu
Editing, Renaming, or Adjusting Stain Programs
Administrator and User Accounts
Using Reagent Information Tracking
Modifying Level Detect Functions
3.2 Recording Specimen and Reagent Information
Scanning Slides with the Barcode Reader
Scanning Reagent Bottles with the Barcode Reader
Manually Entering Specimen Information
Manually Entering Reagent Information
Section 4: Operating the Stainer