22
2.1 Instrument Setup
Unpacking and Installing the Stainer
Follow this sequence when using this instrument for the first time. Details about these operations are given
in the next three sections.
• Install the drain tube
• Plug in the power cord and switch the power ON (I)
• Install all reagent bottles
• Install the barcode reader (optional)
• Prime all reagent lines
• Perform the Clean Cycle
• Zero the automated reagent level detect sensors
• Perform the Hub Pattern and Spray Volume tests
CAUTION:
Contact ELITechGroup before installing the instrument if there appears to be any damage to the
packaging or instrument.
1. Unpack and inspect the instrument.
2. Check that the contents of the boxes match the packing lists for the instrument and accessories.
3. Open the instrument lid and remove the cardboard tube that protects the hub.
NOTE:
Keep the box and packaging material to repack the instrument if service is required by the
manufacture.
4.
Place the instrument on a flat surface, free from dust and vibration and away from direct sunlight.
NOTE:
Position the instrument with the rear panel at least 30 cm (12 in.) from obstructions or hazardous
materials.
Connecting the Drain Tube and Waste Container
1. Insert the waste tube connector into the rear panel receptacle until a click is
heard.
2. Adjust the tube length to less than 1.8 m (72 in.).
CAUTION:
Keep the drain tube straight and as short as possible. The maximum
length is 1.8 m (72 in.). The waste container must be positioned lower
than the stainer.
Section 2: Setup and Preparation for Operation