210-10 ADL
62/62
599 75 60-77
Steps
Procedure
7. Remove four-way valve assy
Remove the screw on electromagnetic loop, to
remove the loop. Welding cut the spot weld of
four-way valve, to remove the four-way valve
assy. (Release the refrigerant clearly before
welding cutting)
8. Remove bid and small valve
Remove the screw fixing big and small valve, to
remove the valves.
9. Remove compressor
Remove the sound insulation cotton packing
compressor, remove the feet screw nut fixing
compressor, to remove the compressor.
spot
weld
four-way
valve
assy
screw
big valve
small
valve
feet
screw
nut
compressor
sound
insulation
cotton
Содержание EXH09HL1W
Страница 2: ...2010 10 ADL 2 62 599 73 60 74 ...
Страница 5: ...210 10 ADL 5 62 599 75 60 77 2 ESD Requirements ...
Страница 6: ...210 10 ADL 6 62 599 75 60 77 ...
Страница 13: ...210 10 ADL 13 62 599 75 60 77 EXH09HL1W outdoor EXH12HL1W outdoor ...
Страница 28: ...210 10 ADL 28 62 599 75 60 77 BOTTOM VIEW ...
Страница 37: ...210 10 ADL 37 62 599 75 60 77 H6 Malfunction Flowchart ...