
7 MAIN CONTROLS
ELBO CONTROLLI srl
SETHY SIX
3.
Upper right quadrant,
where you can set up the functions of the machine.
Date and time are given by the operative system.
Touch the Elbo Controlli logo to access the Presetter Sethy SIX setup page.
Touch the machine origin key (active after the acquisition of the zero axis) to access the creation,
modification and cancellation functions of machine origin.
Touch the drop-down menu indicating the active machine origin to select the origin to use choosing from
the available ones in the database.
Touch the Tool Set key, active after the acquisition of the zero axis and with an active machine origin
different from “DEFAULT MACHINE” to create, modify and cancel tool tables.
Touch the Camera Function key to open a window through which you can use the calculation functions
and inspection functions of the camera.
Touch the Fixed grid key to enable all measurements and functions in the centre of the display area. (Par.
9.4)
Touch the autocollimation key to take measurements in any part of the screen, only if a correct focusing
of the tool has been made (Par 9.5).
By activating the function “freeze value”, in autocollimation mode, it’s possible to rotate the spindle
maintaining the maximum tangency value measured during the rotation (Par 9.6.3).
All these functions will be analysed and described in the following chapters.
Page 29 of 96
Presetter
Setup
Active machine origin
Date and time
Machine
origins
Tool set
Camera system
functions
Fixed grid
Autotargeting
Measurement
“freezing”
Содержание SETHY SIX
Страница 1: ...INSTALLATION OPERATION AND MAINTENANCE MANUAL rev 1 0 05 13...
Страница 13: ...6 PREPARATION AND INSTALLATION ELBO CONTROLLI srl SETHY SIX Page 13 of 96 Figure 2 Unpacking instructions...
Страница 14: ...6 PREPARATION AND INSTALLATION ELBO CONTROLLI srl SETHY SIX Page 14 of 96 Figure 3 Unpacking instructions...
Страница 15: ...6 PREPARATION AND INSTALLATION ELBO CONTROLLI srl SETHY SIX Page 15 of 96...
Страница 16: ...6 PREPARATION AND INSTALLATION ELBO CONTROLLI srl SETHY SIX Page 16 of 96...
Страница 38: ...8 PRELIMINARY OPERATIONS ELBO CONTROLLI srl SETHY SIX Page 38 of 96...
Страница 39: ...8 PRELIMINARY OPERATIONS ELBO CONTROLLI srl SETHY SIX Page 39 of 96...
Страница 65: ...9 212V VISION SYSTEM ELBO CONTROLLI srl SETHY SIX Page 65 of 96...
Страница 93: ...18 ELECTRICAL DIAGRAM ELBO CONTROLLI srl SETHY SIX 18 ELECTRICAL DIAGRAM Page 93 of 96...
Страница 94: ...19 PNEUMATIC DIAGRAM ELBO CONTROLLI srl SETHY SIX 19 PNEUMATIC DIAGRAM Page 94 of 96...