
6 PREPARATION AND INSTALLATION
ELBO CONTROLLI srl
SETHY SIX
6.5 Installation
After the machine has been transferred to the installation site, the unpacking procedure must be followed
with reference to the attached sheet. As for packing, the reverse procedure must be followed.
✔
Unpacking procedure
Page 12 of 96
Figure 1: Unpacking instructions
Содержание SETHY SIX
Страница 1: ...INSTALLATION OPERATION AND MAINTENANCE MANUAL rev 1 0 05 13...
Страница 13: ...6 PREPARATION AND INSTALLATION ELBO CONTROLLI srl SETHY SIX Page 13 of 96 Figure 2 Unpacking instructions...
Страница 14: ...6 PREPARATION AND INSTALLATION ELBO CONTROLLI srl SETHY SIX Page 14 of 96 Figure 3 Unpacking instructions...
Страница 15: ...6 PREPARATION AND INSTALLATION ELBO CONTROLLI srl SETHY SIX Page 15 of 96...
Страница 16: ...6 PREPARATION AND INSTALLATION ELBO CONTROLLI srl SETHY SIX Page 16 of 96...
Страница 38: ...8 PRELIMINARY OPERATIONS ELBO CONTROLLI srl SETHY SIX Page 38 of 96...
Страница 39: ...8 PRELIMINARY OPERATIONS ELBO CONTROLLI srl SETHY SIX Page 39 of 96...
Страница 65: ...9 212V VISION SYSTEM ELBO CONTROLLI srl SETHY SIX Page 65 of 96...
Страница 93: ...18 ELECTRICAL DIAGRAM ELBO CONTROLLI srl SETHY SIX 18 ELECTRICAL DIAGRAM Page 93 of 96...
Страница 94: ...19 PNEUMATIC DIAGRAM ELBO CONTROLLI srl SETHY SIX 19 PNEUMATIC DIAGRAM Page 94 of 96...