Building X-treme Big One
8
Document versie: V1.1
²
2.
Assembly of controls casing & cables
•
Now we can install the “controls casing”.
The bottom rear should fit in the groove of the aluminium profile at the bottom of frame F4.
Once this is at his place it can be fixed with the toggle latch.
•
The latch should be fitted into the hook which can be found on the frame F4.
VERY IMPORTANT: NOW WE FIRST NEED TO PLACE THE PRICE CASING
INSIDE THE FRAME!!! DO NOT YET FIX IT.
Содержание Big One X-treme
Страница 28: ...Building X treme Big One 23 Document versie V1 1...
Страница 61: ...2...
Страница 63: ...4...
Страница 80: ...21...
Страница 85: ...technical file Big One X treme 1 MANUAL 2 CABINETS 3 PRIMARY CIRCUITS 4 ELECTRONICS 5 FUNCTIONALITY 6 WIRING...
Страница 87: ...technical file Big One X treme 1 MANUAL 2 CABINETS 3 PRIMARY CIRCUITS 4 ELECTRONICS 5 FUNCTIONALITY 6 WIRING...
Страница 107: ...missing txt datasheet missing Pagina 1...
Страница 109: ...technical file Big One X treme 1 MANUAL 2 CABINETS 3 PRIMARY CIRCUITS 4 ELECTRONICS 5 FUNCTIONALITY 6 WIRING...
Страница 112: ...technical file Big One X treme 1 MANUAL 2 CABINETS 3 PRIMARY CIRCUITS 4 ELECTRONICS 5 FUNCTIONALITY 6 WIRING...
Страница 113: ...refer to machine manual...
Страница 114: ...technical file Big One X treme 1 MANUAL 2 CABINETS 3 PRIMARY CIRCUITS 4 ELECTRONICS 5 FUNCTIONALITY 6 WIRING...
Страница 127: ...Refer to digital version for part datasheets...