INSTRUCTIONS FOR USE
NP-DK50 2V-5_04-2011_A
- 38 -
11/2010
1
-
Outline of the case
2
-
Outline of the base
3
-
Front part of the case - door
4
-
Pressurised air connector
G3/8"
5
-
Supply voltage
230V/50(60)Hz 3Gx1.5x1000
400V/50(60)Hz 5Gx1.0x3000
-
all dimensions in millimeters
-
wall distance min. 100mm
mm was between electric motor and plastic foam on the rear panel of the housing.
Orientate the
output pressure hose to the rear part of the compressor. Connect the power cord of the compressor (39) into
the socket (34) on the electric panel of the housing. Place the threaded joint with a tap (37) into the hole on
the side of the housing and place PUR hose with Ø8 / Ø6 (36). Blind the hole on the opposite side of the
housing with a plug with Ø15.5.
(Selection of the side for placing treaded joint with a tap depends upon the
decision of a customer).
The other end of the hose (36) place into the straight threaded joint (38) on the air
chamber. Place a hose (40) leading from manometer into the angular threaded joint on the air chamber (42).
Protrude the pressure hose via a hole in the hosing and connect it to the appliance in a suitable way.
Connect the power cord plug leading from the housing into the mains socket. Insert the connector of earthing
wire onto the door and screw it onto the housing. Cover the holes after the screws using white end caps
with
Ø11. Close the top panel of the housing and lock the locks.
Compressor in box DK50 2V/110S/M, DK50 2x2V/110S/M
(Fig.7, Fig.9)
After removing all packaging material, place the product on the floor and remove stabilization parts X and Y
(Detail A). Place the wall-mounted stopper (28) - 2 pcs onto the compressor housing in the rear top part of
the housing and put the housing onto a required place. The stoppers provide a sufficient distance of the
housing from a wall for thorough ventilation. Dismount the door, fixed using 4 screws M5 (48) located in the
tapered edges of the door and disconnect earthing wire. If necessary, the top panel of the housing may be
opened by releasing the locks (47) by moderate rotation of screw driver according to pictogram and lifting
using a handrail (53). Gas springs (49) hold it in an open position. Insert the compressor into the housing so
that the compressed air outlet was oriented towards operators and
so that ventilator of a dryer was
inserted into the venting tunnel in a housing.
Orientate the output pressure hose to the rear part of the
compressor. Connect the power supply cord of compressor (39) to the socket (34) on electric panel of the
housing. Place the drain hose into a container prepared in advance. Blind the holes at the sides of the
housing using a plug with Ø15.5. Place a hose (40) leading from manometer into the angular threaded joint
on the air chamber (42). Protrude the pressure hose via a hole in the housing and connect it to the appliance
in a suitable way. Connect the power cord plug leading from the housing into the mains socket. Put on the
connector of earthing wire onto the door and screw it onto the housing. Cover the holes after the screws
using white end caps with
Ø11. Close the top panel of the housing and lock the locks.
Compressor DK50 2V/110M, DK50 2x2V/110M,
DK50 2V/110, DK50 2x2V/110 which was not delivered
together with the case S110
(Fig.7, Fig.9)
Prior to the placing of compressor into the case, it is necessary to make the following works at the
compressor:
Remove tap for the drainage of condensate (15) from air chamber (bonded joint) and to replace it with
straight fitting Ø8 - ¼“ (12) (bond).
Remove the fitting (16) for the connection of output pressure hose (bonded joint) and place it into angular
fitting (17) 3/8" M/F (bond). Then fix this unit to the original place of fitting (bond) so that the output of air
was directed downwards.
Remove the plug (bonded joint) and to replace it with angulare fitting (13) ¼ M-8/6 (bond).
Place the compressor into the housing similarly as in the previous paragraphs for compressor in a housing
DK50 2V/110S/M, DK50 2x2V/110S/M or compressor in a housing DK50 2V/110S, DK50 2x2V/110S.
While closing the upper board, it is necessary to increase the care – the risk of squeezing
the fingers of a hand.
After closing the lid of the case it is necessary to secure the fast-on elements!
Fig.10
Содержание DK-50 2x2V/110
Страница 1: ......
Страница 2: ......
Страница 3: ...DK50 2V DK50 2V 110 11 2010 1 NP DK50 2V 5_04 2011_A OBSAH 2 CONTENTS 23 INHALT 44 Ed 5 ...
Страница 14: ...NÁVOD NA POUŽITIE NP DK50 2V 5_04 2011_A 12 11 2010 Obr 5 Kompresor s kondenzačnou jednotkou KJF Obr 6 Skrinka ...
Страница 15: ...NÁVOD NA POUŽITIE 11 2010 13 NP DK50 2V 5_04 2011_A Obr 7 Skrinka S110 ...
Страница 37: ...INSTRUCTIONS FOR USE 11 2010 35 NP DK50 2V 5_04 2011_A Fig 7 Box S110 ...
Страница 59: ...GEBRAUCHSANWEISUNG 11 2010 57 NP DK50 2V 5_04 2011_A Bild 7 Kasten S110 ...
Страница 85: ...SERVISNÝ MANUÁL SERVICE MANUAL SERVICEHANDBUCH 11 2010 83 NP DK50 2V 5_04 2011_A ...
Страница 105: ...ZÁRUČNÝ LIST GUARANTEE GARANTIEBRIEF 11 2010 103 NP DK50 2V 5_04 2011_A ...
Страница 106: ...DK50 2V DK50 2V 110 NP DK50 2V 5_04 2011_A 104 11 2010 ...
Страница 107: ...ZÁRUČNÝ LIST GUARANTEE GARANTIEBRIEF 11 2010 105 NP DK50 2V 5_04 2011_A ...
Страница 108: ......