EcoSource Low Voltage Installation
Low Voltage Installation
Always ensure power has been turned off before starting installation.
EcoSource Low Voltage Required Equipment
•
EcoSource (P/N: SS6500)
•
EcoTouch (P/N: SS6560)
•
Voltmeter
•
Level
•
Phillips Head Screwdriver
•
Precision Screwdriver
•
UL rated insulating tape
•
Wire stripper
•
Wire nuts
Additional Hardware Required for Drywall Mount
•
Four 50 lb. EZ-Lock anchors and provided screws
Additional Hardware Required for VERTICAL JBOX Mount
•
Telkonet JBOX Adapter Plate
•
Two #6-32 1” screws
•
Four $5 ½” coarse thread screws
Additional Hardware Required for HORIZONTAL JBOX Mount
•
Two #6-32 1” screws
•
1 Speed Nut (flat-type speed nut fastener that accommodates a #6-32 1” screw as shown in Figure
12.
Figure 12-Speed Nut
Installation Instructions Common to All Three Low Voltage Options
Step 1
If applicable, determine the location in the room where the thermostat will be installed. (See
EcoTouch Thermostat Location Planning section, page 24.)
EcoWave Featur ing EcoTouch IO&M Guide
Telkonet, Inc.
For Use w ith Fir mw ar e Ver sion 2.x
20800 Sw enson Dr ive, Suite 175
EcoSour ce
Waukesha, WI 53186
Revision 2
(800) 380-9640
Page 14
w w w .telkonet.com