EcoSource High Voltage Installation
CAUTION!
•
Weco terminal on-site wiring for high voltage installation is not allowed. You must use the pre-
shipped 16-guage wired backplate provided by Telkonet.
•
High voltage installation should only be performed by a qualified heating & air conditioning
contractor or licensed electrician.
•
Failure to understand and follow all instructions carefully before installing or operating this
device could cause personal injury and/or property damage.
•
All wiring must conform to local and national electrical ordinances and codes.
•
Prevent electrical shock, personal injury, and equipment damage: prior to installation or
service, disconnect system’s electric power at main fuse or circuit breaker box.
Figure 2: Telkonet JBOX Adapter Plate
For all high voltage installations a single gang mud ring must be mounted VERTICALLY on a JBOX. A Telkonet
JBOX Adapter Plate (see Figure 2) is required for all JBOX installations.
EcoSource High Voltage Required Equipment
•
EcoSource (P/N: SS6500)
•
EcoTouch (P/N: SS6560)
•
High Voltage Backplate
•
Telkonet High Voltage JBOX Adapter
•
Two #6-32 1” screws
•
Four #5 ½” coarse thread screws
•
Voltmeter
•
Level
•
Phillips screwdriver
•
UL rated insulating tape
•
Wire stripper
•
Wire cutter
•
Wire nuts
EcoWave Featur ing EcoTouch IO&M Guide
Telkonet, Inc.
For Use w ith Fir mw ar e Ver sion 2.x
20800 Sw enson Dr ive, Suite 175
EcoSour ce
Waukesha, WI 53186
Revision 2
(800) 380-9640
Page 7
w w w .telkonet.com