2
OCCASIONALLY INSPECT AND TIGHTEN SCREWS/BOLTS AS NECESSARY AFTER USE.
No.
Name
QTY
1
Right Front Leg
1PC
1
Left Front Leg
1PC
2
Upper Frame
1PC
3
Left Rear Leg
1PC
3
Right Rear Leg
1PC
4
Bottom Shelf
1PC
5
Fixed Wheel
2 PCS
6
2 PCS
No.
Name
Size
QTY
A
Flat Head Screw-1/2” Long
M6*15 32PCS
B
Wheel Bolt 1” Long
M8*15 16PCS
C
Lock Washer
M8
16PCS
D
Flat Washer
M8
16PCS
ECO-710
10
page|6
NOTE!!
If
YOU HAVE PURCHASED A UNIT WITH THIS ASSEMBLY STEP COMPLETED.
Move to pg. 7
Assembly of the Base Cart
provided in case you need to replace a screw later.
Always check regularly to make sure all hardware is tight.
Once the pallet is close to the place where your oven will go, it's time to unpack it. Remove the
carton and empty the contents of the oven chambers to lighten up the unit to move it into
place. Remove all the accessories from the bottom shelf.
Your unit was Pre-Assembled and we've installed a ramp on one side to allow you to roll it off the
pallet, but please empty everything out of the oven first and install the handles.
REMOVING THE OVEN FROM THE PALLET
Please Note!! Your cart was already assembled onto the main frame. Remove the front and the
back blocking on the face of the cart. Remove the Accessories on the cart. Once you have
added the handles to the sides, lift one handle at a time and have a helper remove the foam
sheet on top of the pallet frame under the bottom shelf. That should allow the wheels to hit the
pallet. Unlock the brakes and roll the unit down the ramp!