Installation and Startup of AL 300
17
Version 3-1 05. Dezember 2019
4
Installation and Startup of AL 300
Important Safety Notes
!
Before installation and startup the chapter 1 must be read.
All safety notes and hazard warnings should be noted.
4.1
Panel mounting of AL 300 S
The AL 300 S Operator Terminal for panel mounting is installed in a metal cage with plastic front and can be
mounted either in a switch cabinet (AL 300 S) or a plastic casing (AL 300 W, see chapter 4.2). The power con
sumption of the Operator Terminal is 5 VA. When installing, make sure to maintain adequate clearance from the
cable duct or device above and below for removal of heat.
The AL 300 S / AL 300 W Operator Terminal with inserted rubber gasket (2) is pushed from outside through the
panel cut-out in the control panel or plastic panel (3) and screwed to the mounting frame (4) behind it using 4
fastening screws (6):
ZNR.
51203
68
030
D0
(6)
M3 x ( 13 + d) mm
(2)
(3)
(4)
(1)
(5)
d
(1): Front panel
(2): Rubber gasket
(3): Control panel
(4) : Mounting frame
(5): Insert nut M3
(6): Fastening screws
See Section “Specifications” for electrical enclosure, measurements and panel mounting cut-out.
See the Pin and Terminal Assignments chapter for wiring details.
Содержание AL 300 S
Страница 21: ...Function of AL 300 16 Version 3 1 05 Dezember 2019 Notice ...
Страница 31: ...Pin and Terminal Assignments of AL 300 26 Version 3 1 05 Dezember 2019 Notice ...
Страница 51: ...Decommissioning and disposal 46 Version 3 1 05 Dezember 2019 Notice ...
Страница 59: ...Specifications of AL 300 54 Version 3 1 05 Dezember 2019 Notice ...
Страница 61: ...Order numbers and accessories of AL 300 56 Version 3 1 05 Dezember 2019 Notice ...