Labeling

Digital Switch labeling is a factory option. 

Table 7 .  Digital Switch Labeling

DS  

Color

Font  

Style

Font  

Color

Title  

Letters

Button  

Letters

Almond

Helvetica

Black

16

4

Black

Helvetica

White

16

4

White

Helvetica

Black

16

4

Programming and configuration

The Pow-R-Command Digital Switch can be programmed 

and configured utilizing the PRC-E controller integrated 

Web page, or Lighting Optimization Software (LOS). Each 

configuration parameter is easily set through a user-friendly 

“point and click” interface. From the interface, the user will 

have the ability to change a number of switch parameters. 

See the “Web Page Programming” section of this 

document for more information.

Specifications

Electrical

24 V / 100 mA AC power is provided to each switch 

through the CAT-6 network cable

Operating environment

Designed for indoor environment

Operating temperature: –10 °C to +40 ºC (14 °F to 104 ºF)

Relative humidity: 10% to 90% noncondensing

Atmosphere: non-explosive and non-corrosive

Vibration: stationary application—NEMA Level A

Certifications

FCC and UL approved

Figure 39 .  Digital Switch Labeling Example

Digital Switch network installation

Installing RJ-45 connector to 23 AWG CAT6 cable

In order to complete installation of Pow-R-Command Digital 

Switches (PRCDS) the installer must first pull 23-gauge 

CAT6 network cable from the Pow-R-Command controller 

to each PRCDS forming a daisy chain network architecture. 

Once the cable is pulled into each switch box the installer 

is ready to install RJ-45 connectors to the cable following 

T-568B standard for Ethernet twisted pair cables. Cable 

installation kits  that include tools and connectors are 

available at electronics stores. It is recommended that tools 

specifically designed for making Ethernet cables be used 

to help ensure good connections while saving the installer 

time. The following items will be required for this step:

1. 

RJ-45 connectors: These connectors can be purchased 

at most electronic stores and computer stores and 

usually come in bulk packages. It’s always a good idea  

to get more than you expect you will need.

2. 

Crimping tool: These tools are often purchased at 

electronic stores. To create a network cable you will 

need a crimper that is capable of crimping a RJ-45 cable 

(not just a RJ-11 cable, which looks similar to a RJ-45).

3. 

CAT6 stripper or knife: If you plan on making several 

network cables you should also consider getting a wire 

stripper capable of stripping CAT6. If you do not plan 

on creating many network cables a knife will suffice. 

For simplicity and to prevent potential issues we 

recommend a wire stripper. 

4. 

Professional electricians scissors designed for use in 

electrical, telephone and datacomm service applications 

are recommended. These types of scissors are 

ergonomically designed with large ring to provide more 

power while reducing fatigue and wrist strain. Their 

bottom blades feature serrated teeth for gripping cable 

and wire. 

Figure 40 .  Typical Cable Installation Kit

Содержание PRC-E Series

Страница 1: ...PRC E Series Instruction Manual Effective August 2015 PRC E Series ...

Страница 2: ... PURPOSE OR MERCHANTABILITY OTHER THAN THOSE SPECIFICALLY SET OUT IN ANY EXISTING CONTRACT BETWEEN THE PARTIES ANY SUCH CONTRACT STATES THE ENTIRE OBLIGATION OF EATON THE CONTENTS OF THIS DOCUMENT SHALL NOT BECOME PART OF OR MODIFY ANY CONTRACT BETWEEN THE PARTIES In no event will Eaton be responsible to the purchaser or user in contract in tort including negligence strict liability or other wise ...

Страница 3: ...IEW 3 PRC E SERIES EXTERNALLY MOUNTED CONTROLLER CABINET 6 FIELD WIRING TERMINATION 5 CONTROLLER NETWORK CNET OVERVIEW 12 ETHERNET NETWORK 14 LCD PROGRAMMING 17 WEB PAGE PROGRAMMING 46 APPENDIX A BREAKER CONTROL BUS BCB INSTALLATION 78 APPENDIX B DIGITAL SWITCH 81 APPENDIX C BACNET INTEGRATION 87 APPENDIX D FIRMWARE UPDATES 90 ...

Страница 4: ...e severe injury or death and or damage to the equipment Some Pow R CommandE panelboards may be shipped from the factory with the electronic boards installed and tested Many of the electronic components may be sensitive to static electricity Do not handle electronic parts without proper electrostatic protection Document all wiring device termination and locations This information will be required f...

Страница 5: ...ms PRC components include controller with low voltage power supply Breaker Control Bus BCB and solenoid operated controllable circuit breakers PRC Expansion Panelboards PRCEP are designed to directly connect to PRC E Series Master panelboards via controller SLAN communications PRCEP includes Breaker Control Bus BCB and solenoid operated controllable circuit breaker PRC E Series systems are scalabl...

Страница 6: ...lowing the controller to monitor and control up to 168 controllable circuit breakers Pow R Command panelboard assemblies are configurable with a BCB on the left right or both sides of the panelboard to add flexibility in the system design Controllable circuit breakers GHQRD and BABRSP controllable circuit breakers include standard circuit protection and control The solenoid operated mechanism prov...

Страница 7: ...dry contact devices such as wall stations occupancy sensors and photocells Eight universal inputs can be programmed to accept either digital or analog external devices Compatible with dry contact devices such as wall stations occupancy sensors and photocells when programmed as digital inputs When programmed as 0 10 Vdc analog inputs devices such as indoor and outdoor photo sensors can be connected...

Страница 8: ...PRC E externally mounted controllers are available for retrofit and renovation projects when existing panelboards do not have required controller mounting space Externally mounted controllers include controller control power transformer mounted in a NEMAT 1 enclosure The PRC E externally mounted controller is connected to PRC Expansion Panelboards using the controller SLAN sub network Figure 5 PRC...

Страница 9: ...ntrol voltages are generated internally The integrated PRC E Series controllers include a 30 Vac supply transformer that is connected to the line to line voltage of the panelboard 208 240 480 Vac The PRC E Series external controller enclosures include a 30 Vac supply transformer that is connected to the line to neutral of the panelboard 120 277 Vac The connection to the controller transformer depe...

Страница 10: ...operly especially for plenum or hazardous applications Note N When wiring to the PRC E Series controller and BCBs mounted inside the panelboard it is necessary to observe the 600 V insulation rating of any Class 2 wiring in the panelboard gutter If the wiring is not rated at 600 V then any wiring passing through the gutter will need to be enclosed in conduit or other recognized material Breaker Co...

Страница 11: ...either inserted into the BCB or in the parts bag strip the jacket back to a maximum of 1 1 4 inches Be careful not to nick or cut the insulation of the individual conductors Strip each conductor to expose no more than 1 4 inch of bare wire Using Figure 10 for reference insert each colored conductor in the proper position on the 4 pin plug Figure 10 BCB Connector Wire Out otee N Both connectors on ...

Страница 12: ...signed for reliable SLAN communications Figure 14 shows the recommended addressing scheme each BCB gets an address from 1 to 8 Refer to Figure 8 to locate the SLAN address switches and reference Figure 14 for positioning of the individual switches to achieve the required value Be careful to observe the switch number as labeled so as to avoid reversing the values due to top and bottom module locati...

Страница 13: ...tors for Ethernet PRC2000E and PRC1500E only Controller Network CNET not available on PRC750E Digital Switch Network DSN not available on PRC750E Micro SD and low voltage I O For more information on the Ethernet and Controller Network CNET connections see the Network overview section on page 12 For more information on the DSN see the Digital Switch section on page 81 The USB port is for system lev...

Страница 14: ...can be powered from the controller as shown from the 12 Vdc 500 mA maximum power supply connection within the controller or from an external power source Reference PRCE Input Output drawing for field devices Universal inputs Universal input points can be defined as digital input points or as analog input points If used as a digital input point a dry contact should be placed between the input point...

Страница 15: ...T THE NEGATIVE CONNECTION SHOULD BE COMPLETED PRIOR TO THE POSITIVE CONNECTION OF THE ANALOG OUTPUT 0 10 V dimming fluorescent ballast or LED driver connection to analog output Switch Override Controller The Pow R Command Switch Override Controller PRCSOC can be used to connect digital and analog I O to PRC systems This device is recommended when controller onboard digital and analog I O has been ...

Страница 16: ...rotocol Configurable using PRC Lighting Optimization Software Provided in a NEMA 1 enclosure 120 277 Vac supply voltage Not compatible with PRC750 E controllers Catalog Number Description Part Number PRCSOCC PRC SOC in an ext cabinet 120 V 277 V 42C4780G01 PRCSOCEC PRC SOC in an ext cabinet no power supply 42C4780G02 PRCSOCECO PRC SOC in an ext cabinet 120 V 277 V with pilot output card 42C4780G03...

Страница 17: ...re not allowed The end of the RS 485 network requires a 120 ohm end of line EOL termination The CNET communications module provides a jumper for applying the terminating EOL resistor in the controller By default the jumper is not connected To add the resistor place the jumper across the 5th set of posts marked with a T See Figure 21 controller network jumpers Figure 21 CNET Module One end of the c...

Страница 18: ... the provided 15 Vdc power supply that plugs into any standard wall outlet It also has an On Off switch power indicator LED and communication indicator LED Pow R Command Lighting Optimization Software PRCLOS is required to access the system Ethernet network The PRC1500E and PRC2000E controllers are connected to an Ethernet network by using the RJ 45 connector located in the low voltage compartment...

Страница 19: ...sonal computer is physically connected to the controller Maintenance Port using a standard Ethernet patch cable Figure 26 Controller Maintenance Port Connection Before logging into the controller the personal computer must be set to obtain an IP address automatically This can be done using MicrosoftT WindowsT by following these steps Step 1 Select Start Step 2 Select Control Panel Step 3 Select Ne...

Страница 20: ... a standard Web browser and typing 192 168 222 1 into the browser s address bar also know as the location bar or URL bar and pressing the Enter button The PRC splash screen should open In a few moments the User Name and Password dialog will open Step 10 Type the user name and password in the appropriate box and click OK Default user name admin Default password admin A splash screen will open After...

Страница 21: ...D access can be secured by an optional Pin code which can be set in the software Note N The BCB installation addressing and correct cabling is crucial to the successful control of the controllable circuit breakers See the BCB installation section on page 78 for further information on cabling and correct state of the status LEDs on the BCB In the idle state the LCD will have a blank screen Log in T...

Страница 22: ...he panelboard location By default the panelboard configuration uses the BCB addresses to set up a 42 circuit panelboard The odd addresses are assigned as left BCBs and the even addresses are assigned as right BCBs From the Main Menu tap the Configuration icon This will display the Configuration menu screen Tap Panelboards icon This will display the Panelboard Configuration screen This screen displ...

Страница 23: ...red 2 18 18 circuit Left 30 Odd numbered 1 29 30 circuit Right 30 Even numbered 2 30 30 circuit Top Sequential 1 21 30 and 42 circuit column Bottom Sequential 22 42 42 circuit column Top 9 Sequential 1 9 9 circuit column Bottom 30 Sequential 22 30 30 circuit column Once all the BCB configuration edits are complete tap the red Save button to save the changes or the Back button to disregard changes ...

Страница 24: ...lay the Panelboard Configuration screen Tap the Discover Breakers button in the left bottom corner of the screen This will display the discovery confirmation page Tap the Confirm Discover Breakers icon There will be a message displayed Please Wait Discovering Breakers Once this is complete tap the Back button This will display the Panelboard Configuration screen Tap the Back button This will displ...

Страница 25: ...board The Breakers screen displays all controllable circuit breakers that were discovered configured by their position in the panelboard If a number is greyed out there was no controllable circuit breaker discovered in that position This screen can be compared with the physical panelboard layout to find issues Note N If there is a controllable circuit breaker that is physically installed but was m...

Страница 26: ... issues A red circuit number with green background indicates that the commanded state is ON but the feedback status is OFF Note N The main handle of the controllable circuit breaker being in the OFF position can create the above condition A green circuit number with red background indicates that the commanded state is OFF but the feedback status is ON Note N Manually moving the control handle of t...

Страница 27: ...an individual controllable circuit breaker override should be done instead of a global panelboards override Tap Override ON button to initialize all controllable circuit breakers handles in the panelboard selected to the ON position All circuit breaker buttons on the LCD display should have a red background with yellow borders after the Override ON command If some of the backgrounds are green see ...

Страница 28: ...panelboard clear override Tap Clear Override button to clear override for all the controllable circuit breakers in selected panelboard and return them to normal in service state Note N The yellow Override LED on the PRC E controller will turn off Overriding all the breakers in ALL connected panelboards From Main Menu screen tap the Breakers button This will display the Breakers Select Panelboard s...

Страница 29: ...gating to the individual Breakers screen for particular panelboard This is done by tapping the panelboard button to display the Breakers screen Then tap the Back button to return to the Breakers Select Panelboard screen Note N The yellow Override LED on the PRC E controller will illuminate indicating an override is active Clear Override All Note N All of the controllable circuit breakers in all th...

Страница 30: ...ed for this controllable circuit breaker Note N The yellow Override LED on the PRC E controller will illuminate indicating an override is active Override circuit breaker OFF Tap Override OFF button to override the selected controllable circuit breaker OFF The selected controllable circuit breaker s status should display OFF OFF OUT In the Breakers screen for selected panelboard the individual cont...

Страница 31: ...board Tap characters numbers buttons to type the chosen text and tap the Enter button to accept Grouping association Groups are logical groupings of controllable circuit breakers with a single point of control means There are 16 default groups groups A through P that can be easily programmed to create zones of controllable circuit breakers From the Breaker Configuration screen you can quickly add ...

Страница 32: ...r Tap the current year on the calendar This will display an edit box with up and down arrows Tap the up down arrows to change the year accordingly Setting the date Once the month and year are selected Tap the appropriate day to finish setting the date If any changes are made in the Enter Date screen the Enter button will turn red to signify that changes need to be accepted To leave the page withou...

Страница 33: ...quire user to come back to this screen year after year to reset the dates If user requires manual date entry tap the Manual Dates radio button Tap the Spring date entry field This will display the calendar screen tool Choose the date for the Spring DST change See the above details on how to use the calendar Tap the Fall date entry field This will display the calendar screen tool Choose the date fo...

Страница 34: ...e entry field This will display the alphanumeric keyboard to input the Longitude coordinates Once done editing the field tap the Enter button to accept changes Tap the up down arrows beside the Time Zone field to input the Time Zone hours behind GMT Note N Notice that the Save button in the top right corner of the Date Time Location Configuration screen did turn red indicating that there are some ...

Страница 35: ...e button is tapped Editing controller address Tap the address arrow This will display a dropdown list of address numbers Scroll through the list and Tap the number to select required address Once the controller configuration edits are complete tap the red Save button to save the changes To leave the page without saving changes just tap the Back button Controller Ethernet network configuration PRC1...

Страница 36: ...are some changes to the configuration in this screen The changes were accepted but not yet saved in the controller until the red Save button is tapped UER settings The Universal Ethernet Router UER is a built in protocol used for communications between PRC E Series controllers over the Ethernet network The System ID is the port used for communication with a range of 1 to 65535 and the Security Mas...

Страница 37: ... using a color code An ON group status is the group letter with a red background An OFF group status is the group letter with a green background Group configuration screen In the Groups screen tap the group letter box This will display the Group configuration screen for the specific group to be edited In the Group configuration screen the current group s attributes are displayed The group s letter...

Страница 38: ...nual ON OFF control for the group included on the Group configuration screen To turn ON the group tap the ON button The group turns ON and the background of the status icon turns red To turn OFF the group tap the OFF button The group turns OFF and the background of the status icon turns green Adding controllable circuit breakers to a group In the selected group s Group configuration screen tap the...

Страница 39: ...hedules for the selected group only Note N Some schedules may be listed on higher numbered lines scrolling down may be required to view all schedules See the Creating Time Schedules section of this document for more details on the schedule screens creating and removing schedules Associating an input with a group An Input can be associated to a Group to control it ON and OFF This action in turn com...

Страница 40: ...tion edits are complete tap the red Save button to save the changes To leave the page without saving changes just tap the Back button Creating time schedules Schedules are ON OFF actions programmed to control points within the Pow R Command system A point can be a flag controllable circuit breaker or group The schedule can be by the day of the week time of day the date and or astro time This can b...

Страница 41: ...separated by the single space character for example GRPD ON B127 ON Note N When in the Associate Schedule with Group configuration area the only command allowed is the selected group ON which is automatically entered in the Action field and can not be changed The general Schedules configuration area allows combination entry of the multiple commands Once in the Edit Schedule screen tap the Action l...

Страница 42: ...eed to be accepted Tap the red Enter button to accept the changes and return to the Schedules screen Note N Notice that the Save button in the top right corner of the Edit Schedule screen did turn red indicating that there are some changes to the configuration in this screen The changes were accepted but not yet saved in the controller until the red Save button is tapped Periodic schedule entry A ...

Страница 43: ...wing above procedure Note N Notice that the Save button in the top right corner of the Edit Schedule screen did turn red indicating that there are some changes to the configuration in this screen The changes were accepted but not yet saved in the controller until the red Save button is tapped Once the time schedule edits are complete tap the red Save button to save the changes To leave the page wi...

Страница 44: ... Save button is tapped Once the time schedule edits are complete tap the red Save button to save the changes To leave the page without saving changes just tap the Back button Note N The time schedules From and Until times can be mixed between an absolute format and any of the relative formats for example the time schedule can start from a relative time i e Before After Sunset and end at an absolut...

Страница 45: ...backup schedule Backup schedules are only used in networked systems with a master device In this case the master device will provide most of the system scheduling to maintain centralized control Master devices that can enable this feature include the PRC5000 and the Ethernet Interface Module EIM However if the Network is down or the master device has lost connection the system will still have a me...

Страница 46: ...and day specified it will activate every year on the same date Care must be taken managing holidays on the yearly basis Selecting a Day as a Holiday In the Schedules screen tap the Holidays button This will display the Holidays configuration list screen Tap the first empty line This will display the Edit Holiday configuration screen Tap the Date entry field or ellipsis This will display the calend...

Страница 47: ...This will display the Holidays screen Tap the Holiday line to delete This will display the Edit Holiday configuration screen Tap the Delete button The holiday will be removed from the list BACnet network configuration The PRC1500E and PRC2000E controllers have native BACnet IP capabilities The attributes needed for BACnet system communication are set using the BACnet configuration screen These set...

Страница 48: ...configuration in this screen The changes were accepted but not yet saved in the controller until the red Save button is tapped Once the BACnet configuration edits are complete tap the red Save button to save the changes To leave the page without saving changes just tap the Back button I O status The I O status displays current status levels of the digital and analog inputs and outputs in the PRC E...

Страница 49: ...nformation The Digital Switches screen displays a list to the DSN devices connected to the controller In the Main Menu screen tap the Digital Switches icon This will display the Digital Switches screen This Screen displays the PRC Digital Switch Information only The number is the unique Digital Switch address The address range is 1 to 99 The switch Description is an alphanumeric description of the...

Страница 50: ...n IP address is received the PRC E controller can be accessed using any standard Web browser The Maintenance Port of the PRC E controller has a default IP address of 192 168 222 1 Connecting to the controller through the Maintenance Port Connect the PC to the Maintenance Port using a standard patch cable open your Web browser of choice Type 192 168 222 1 in the address field For further instructio...

Страница 51: ...der of the tabs but all aspects of each will be covered There are visible and some context menu elements on each Web page Panelboard configuration Note N The Breaker Control Buses BCBs must be properly addressed and all necessary SLAN wiring must be terminated before continuing the following On initial commissioning or in the case of any newly added PRCEP panelboard s to a system the panelboard s ...

Страница 52: ...Bs in the Master panelboard and all PRCEP panelboards connected to it will be scanned for the presence of controllable circuit breakers The presence of each controllable circuit breaker is captured and stored in the controller s database The BCB addressing is critical for this process to be successful In the Master and PRCEP panelboards each BCB should have a unique address of 1 8 See the BCB Addr...

Страница 53: ...se the correct panelboard from the list Editing the BCB panelboard configuration Click the BCB address button of the BCB that needs to be updated This will open the dropdown list for the BCB addresses Choose the address for the BCB or choose None if there is not a BCB in this position in the panelboard Editing the name of the BCB Click the name text box The textbox opens for edit and can be edited...

Страница 54: ... open the dropdown list Click to choose the address of the BCB in the panelboard Click the BCB name text box Use the keyboard to enter the 4 character name Note N If two BCBs are given the same address the position ID text and the BCB ID number will turn red to indicate that there is an issue with the addressing To accept the panelboard configuration edits click Save Changes Once all the panelboar...

Страница 55: ...ated Breaker configuration The Breaker screen displays the panelboards and the individual controllable circuit breaker The panelboards are chosen by using the Panels button across the top of the circuit breaker layout By default panelboard 1 is displayed To navigate to a different panelboard click the panelboard number button This will display the layout for the panelboard chosen The breaker scree...

Страница 56: ...ates the ON OFF feedback status from the controllable circuit breaker Note N The feedback status is received from the controllable circuit breaker If the main handle is OFF the status feedback will always be OFF A green background indicates that the controllable circuit breaker has a feedback status of OFF A red background indicates that the controllable circuit breaker has a feedback status of ON...

Страница 57: ...The selected controllable circuit breaker status should display OFF with a message in red stating Out of Service Click the Close button In the Breakers screen the controllable circuit breaker status button background should now be green with the OFF text denoting the last command was an OFF command and the feedback status is OFF The circuit number should now have a yellow background The yellow bac...

Страница 58: ...y control a group double click the group name button This will open the Point Status screen for the group The Point Status screen displays the point address point name and status at the top To manually control the chosen group click the ON or OFF button to turn on the group or turn off the group respectively All controllable circuit breakers associated with the group will follow the control of the...

Страница 59: ... To use the North American Standard click the radio button for this selection The Daylight Savings dates for the North American Standard are automatically calculated and no customer entry is required This is the most common selection This selection does not require a user to return to this screen every year to reset the dates If manual date entry is required click the Manual Dates radio button Cli...

Страница 60: ...te fields Once the Date Time DST and or Location configuration edits are complete click the Save Changes button to save the changes Manual location entry If there is no city in the list in close proximity of your location manual coordinate inputs can be entered You can find out your coordinates from the local newspaper Google Maps etc Click the City field This will display a dropdown list of the c...

Страница 61: ...box This opens it for edit Type in the chosen 20 character description for the controller Editing the controller Address Click the Address text or dropdown arrow This opens a dropdown list of addresses Scroll down the list and click to choose the address needed for the controller Once all the controller configuration edits are complete click the Save Changes button to save the changes Note N A red...

Страница 62: ...or edit Type in the chosen soap port for the controller UER settings The Universal Ethernet Router UER is a built in protocol used for communications between PRC E Series controllers over the Ethernet network The System ID is the port used for communication with a range of 1 to 65535 and the Security Mask is the encryption mask to setup separate logical networks on a single Ethernet range 1 to 655...

Страница 63: ...er names can be updated on this screen Additionally manual control of the groups can also be accomplished from this page Status of all groups The 16 group names have a colored background that show the current status of each group using a color code An ON group status is the group name with a red background An OFF group status is the group name with a green background Editing the group name and des...

Страница 64: ...ton The group status will show OFF Adding controllable circuit breakers to a group Click the Associate Loads button on the Groups screen The lower pane of the Web page will list all the discovered circuit breakers The listing order is odd numbered circuit breakers are listed first then the even numbered are listed To associate a circuit breaker to a group click the selected group name The backgrou...

Страница 65: ... the dropdown list of digital and universal inputs Scroll through and click to choose the two wire input connected to the controller The Time Delay is a time value set for the group when the switch is activated After the timer delay expires the group will be commanded OFF For example if the time delay is set for 10 minutes when the input is closed the group will turn ON then when the time delay re...

Страница 66: ...ed action Until is the end time of the schedule the end of the commanded action Flags indicate the status of the schedule A indicates that it is an active schedule currently running and B indicates that the schedule is a backup schedule Note N In the Schedules screen the From and Until times are displayed in the military format When entering the time schedules in the Edit Schedule screen the times...

Страница 67: ... then back ON at the Until time Another example is B101 ON This example will turn On any circuit breaker with the name B101 at the From time and turn it Off at the Until time Fixed date schedule entry A Fixed Date schedule is a schedule that will operate only during one single date Note N Since the Fixed Date schedule has only month and day specified it will activate every year on the same date Th...

Страница 68: ... as hours and minutes the OFFSET limit is 7 hours and 59 minutes Available time options are Absolute Before sunrise After sunrise Before sunset After sunset Setting an absolute time schedule To enter the From hour of the schedule click the From hours time textbox This opens the textbox for editing Enter the hour in 12h standard format To enter the minutes click the minutes textbox for the From tim...

Страница 69: ...l times continue to enter Until time following above procedure Make sure to select correct entry the offset time will be After Sunrise in our example Click the OK button to save the changes Creating an event An Event is a schedule that has only a start action From It is created using the same steps as a normal schedule except there will be no ending time To create click the checkbox beside Event t...

Страница 70: ...ill now display the schedule with a B in the Flag column of the list indicating that it is a backup schedule Creating holidays A Holiday is a special day that does not follow the typical daily operational criteria of the system A holiday can be selected for any month day of the year and up to 30 holidays can be created in the PRC E Series controller A 20 character alphanumeric description can be a...

Страница 71: ...r for the PRC E controller on the BACnet system The Network is a routing setting that signifies what part of the system this PRC E Series controller will be associated The Port is the communication port setting This is used for the BACnet communications from the PRC E Series controller Priority levels are set to achieve certain level of command importance in the BACnet system operation A smaller n...

Страница 72: ... the analog output In the normal state there will be a white filled box beside the status box and yellow filled if it is overridden Controls Controls are logical statements that utilize the inputs to control the groups Note N From the Web page a control can be created to command a group only If another type of point control is needed PRC Lighting Optimization software PRCLOS will be required To cr...

Страница 73: ...is a time value set for the group when the switch is activated After the timer delay expires the group will be commanded OFF For example if the time delay is set for 10 minutes when the input is closed the group will turn ON then when the time delay reaches 0 the group will turn OFF Note N For Maintained type switches it does not matter that the switch remains closed the group will turn OFF after ...

Страница 74: ... a table is displayed with the PRC digital switch devices that are connected to the DSN network and their basic attributes Note N If a Digital Switch does not show in the table right click the address line of the DS and choose Refresh in the context menu This should repeat the search for the Digital Switch The number in the column contains the unique Digital Switch address The address range is fro...

Страница 75: ...programming page for DSN Each button on the switch will have a configuration line From this Web page the DSN description button actions for controlled points and button feedback can be programmed Editing the description Click the Description text box This opens it for edit Type in the chosen 20 character alphanumeric description for the switch Setting the button digital point control Each button c...

Страница 76: ...Off it will be commanded On Setting the button analog point control The analog point settings can control the analog output of the switch the calculated points C points of the controller or the analog outputs of the controller The digital switch analog output control is listed as LIGHT_LVL This setting is a numeric value representing the percentage of the 0 10 V output or setpoint for the light le...

Страница 77: ...feedback from the photocell The Feedback Point controls the indicator LED of each button An active button command can illuminate the LED of that button This point can be a circuit breaker flag analog point value etc Default is checked by default With this active the digital switch feedback point textbox is inaccessible The default point will be set as follows Digital point If the digital point act...

Страница 78: ... 2 and 4 button switches have an additional digital input locally on the switches Also a 0 10 V analog output is available on each switch for dimming To access the switch sensor input output configuration click the Sensors tab This displays the configuration page for the inputs and output of the selected digital switch Sensor 1 This is the onboard universal input which is labeled AI on the switch ...

Страница 79: ...p a occupancy sensing with an override OFF scheme Setting up motion enable MOT_EN_ point Click the Buttons tab This displays the button programming page for the DSN Click the Digital Point dropdown arrow of the button to be programmed This opens the dropdown list for a quick pick of the internal motion sensor input enabling This setup is identical for sensor 1 and 2 except the enable point MOT_EN1...

Страница 80: ...g Input Click the Sensors tab Click the radio button beside photocell The internal analog point LIGHT_LVL in the button configuration section now converts to a setpoint for closed loop dimming control After the button is pressed this value is loaded as the setpoint and then it is compared to the photocell feedback The analog output of the switch is adjusted accordingly to drive the light level up ...

Страница 81: ...r the feedback level from the photocell To edit the Maximum feedback level value click the Maximum input box This opens the box for editing Input the required numeric value for the maximum percentage for the feedback level from the photocell To edit the Default feedback level value click the Default input box This opens the box for editing Input the required numeric value for the default setpoint ...

Страница 82: ...lboard therefore the retrofit kit is configured to cover one side of a 42 30 or 18 circuit panelboard The BCB kits available are in 21 15 and 9 circuit configurations An example of use a 30 circuit panelboard with controllable circuit breakers on both sides would require two 15 circuit retrofit kits Figure 27 15 Circuit Breaker BCB Retrofit Kit WARNING DISCONNECT THE MAIN POWER FROM THE PANELBOARD...

Страница 83: ...to hold the BCB in place loosely The general rule is that the control box extends into the wire gutter of the panelboard Step 4 BCB lower mount The BCB is fastened to the C channel by two screws provided Let the BCB hang freely down the channel to locate the bottom mounting hole Figure 31 Locating the BCB Lower Mounting Hole otee N There may not be a hole for the bottom mounting screw If the hole ...

Страница 84: ...ircuit breakers can be seen plugged onto the BCB in Figure 32 Figure 32 Circuit Breakers Connected to BCB To install the right side BCB follow Steps 3 to 6 using Figure 30 through Figure 32 for reference to locate the holes in the right side C channel Note N The view in Figure 32 shows all controllable circuit breakers plugged onto the BCB If there are spaces left by blank positions or uncontrolle...

Страница 85: ... with PRC1000 E PRC1500 E and PRC2000 E controllers PRCDS includes onboard digital and analog I O plus an external device power source Field wired devices like occupancy sensors and photo sensors can be directly wired to the PRCDS to eliminate the need for running field wiring to the electric closet This feature saves installation time and provides lower installed system cost Fluorescent and LED l...

Страница 86: ...n compartment for connection to the DSN network RJ 45 Connector pin out for T 568B PIN 1 Orange white wire terminated to SN PIN 2 Orange terminated to SN PIN 3 Green white terminated to 24 Vac common PIN 4 Blue terminated to 24 Vac PIN 5 Blue white terminated to 24 Vac PIN 6 Green terminated to 24 Vac common PIN 7 Brown white terminated to 24 Vac common PIN 8 Brown terminated to 24 Vac common Figu...

Страница 87: ...NPI may be required for proper operation The PRCDSNPI is required after each 15 PRCDS or when the DSN length exceeds 500 feet DSN connections to the power injector are done in the exact same fashion as each digital switch The PRCDSNPI includes a separate dual voltage 120 277 Vac power supply connection Make sure to connect to an unswitched branch circuit otee N The power injector does not need a n...

Страница 88: ... output of the switch has limited current capabilities Connecting devices that require the higher current to this output will disable operation of the switch Table 6 Digital Switch I O Configuration Pushbutton Configuration Analog Input Analog Output Digital Input 12 Vdc Output 2 button n n n n 4 button n n n n 6 button n n n Figure 38 Typical Digital Switch Field Devices Wiring DSN from Previous ...

Страница 89: ...R Command controller to each PRCDS forming a daisy chain network architecture Once the cable is pulled into each switch box the installer is ready to install RJ 45 connectors to the cable following T 568B standard for Ethernet twisted pair cables Cable installation kits that include tools and connectors are available at electronics stores It is recommended that tools specifically designed for maki...

Страница 90: ...ctor and cut off excess wire using scissors 4 Do these steps for each side of the cable Once both ends of the cable have been completed you are now ready to test your cables Figure 41 RJ 45 Connector and Standard T568B Cable Wiring Testing RJ 45 connectors Testing network cables will require a hand held meter designed for verifying the integrity of Ethernet twisted pair cables These types of teste...

Страница 91: ... See LCD programming guide The BACnet configuration setting available are listed in the table below Ethernet Default BACnet Default IP address 10 0 222 1 Instance Netmask 255 255 0 0 Network 1 Gateway 10 0 0 1 Port 47808 External LAN Priority 13 Internal LAN Priority 15 The BACnet configuration settings are supplied by the Building Automation System integrator Controller Connection If the system h...

Страница 92: ... is reflected in the BACnet Present Value property property 85 and feedback actual status is reflected in the Feedback Value property property 40 Writing to the Binary Output object turns individual circuit breakers ON and OFF if the priority level assigned to the command is above 15 it will put them out of service Relinquishing all priority levels will restore the circuit breaker to in service In...

Страница 93: ...g Value No No Priority_Array Present_Value Device No No Miscellaneous characteristics Data link layer options BACnet IP Annex J Segmentation capability None Character sets supported ANSI X3 4 Basic integration tips When integrating it is important to make sure that the commands sent are If Once Otherwise it is possible to set up a system that constantly energizes the solenoids for the circuit brea...

Страница 94: ...hat the wireless portion of your computer network is disabled and the computer s network configuration is set to accept DHCP assigned address Connect a patch cable between the computer and the front Maintenance Port of the PRC E controller All PRC E controllers Maintenance Ports are configured with a fixed IP address set at 192 168 222 1 Connecting to the controller webpages is accomplished by ope...

Страница 95: ...te Device Firmware webpage Connecting to the PRC2000E PRC1500E controllers over the Ethernet network Open the Internet browser and in the Address field type the IP address of the controller you are trying to connect to Figure 47 xxx xxx xxx xxx Figure 47 Connect to the PRC2000E PRC1500E controllers through the Ethernet network Press Enter key to continue with the connection to the controller Link ...

Страница 96: ...le Find the firmware update file in the previously saved location click on the name of the file and then click on the Open button or double click on the file s name to continue to the next step Figure 52 Figure 53 Select firmware file for the upgrade Import selected firmware update file to the PRC E controller When the file and destination directory have been selected you are ready to upload the f...

Страница 97: ...n the Version webpage locate Firmware Updates area Click on the Reboot Controller button to reboot the PRC E controller Figure 57 The firmware upgrade will be performed automatically by the controller during the boot up process You will be disconnected from the controller during the boot up process Figure 57 Reboot controller 2 Turn off the power to the PRC E controller for a couple of seconds and...

Страница 98: ...94 PRC E Series Instruction Manual MN014003EN August 2015 www eaton com ...

Страница 99: ...95 PRC E Series Instruction Manual MN014003EN August 2015 www eaton com ...

Страница 100: ...power is available when it s needed most With unparalleled knowledge of electrical power management across industries experts at Eaton deliver customized integrated solutions to solve our customers most critical challenges Our focus is on delivering the right solution for the application But decision makers demand more than just innovative products They turn to Eaton for an unwavering commitment t...

Отзывы: