UPS with PPDM Startup for 120V Models
To start up the UPS for 120V models:
1.
If you are connecting the UPS to an AS/400, the QUPSDLYTIM
system value for the UPS Monitoring feature should be set. See
“UPS Monitoring” on page 54 for instructions.
2.
Confirm the Bypass switch on the PPDM rear panel is in the
NORMAL position (see Figure 8 on page 43).
3.
Plug the input power supply cord (use the AS/400 line cord)
into the utility input connector on the PPDM rear panel.
4.
Plug the other end of the power supply cord into a grounded,
three-wire, AC receptacle that has been wired in accordance
with NEC specifications.
The UPS performs diagnostic tests and enters Normal mode
with the equipment (load) offline. The
indicator remains
lit. The startup should take about 15 seconds.
5.
Turn on the equipment that is connected to the UPS.
6.
Press and hold the Output On button until you hear the UPS
beep (approximately one second).
The
indicator remains lit and the Self Test indicator turns
on. The front panel displays the percentage of full load being
applied to the UPS. The UPS is now in Normal mode with the
load online. See “Normal Mode” on page 50 for more
information.
7.
The installation is complete. Continue to Chapter 4, “UPS
Operation” on page 49 for more information on the UPS.
Содержание Powerware Prestige Series 1500 VA
Страница 1: ...powerware Prestige Series 650 VA 1500 VA Installation and Operator s Manual for IBM Applications...
Страница 4: ...This page intentionally left blank...
Страница 101: ...89 Powerware Prestige Series Installation and Operator s Manual for IBM Applications 650 VA 1500 VA Uncontrolled Copy...