UPS Operation
52
Powerware
®
Prestige Series Installation and Operator’s Manual for IBM Applications (650 VA - 1500 VA)
Uncontrolled Copy
When shutdown is imminent, the Self Test indicator flashes. These
warnings are approximate, and the actual time to shutdown may vary
significantly. For approximate battery times see the tables on pages 5
and 6. Once these warnings are indicated, immediately complete and
save your work to prevent data loss and similar difficulties. When utility
power is restored after the UPS shuts down, the UPS automatically
connects to the load when the startup is complete.
Diagnostics
The UPS periodically performs diagnostic tests while the unit is
operating in Normal mode, ensuring proper operation. These tests
include:
:
Self Test
:
Site Fault Test
:
Utility Verification Test
:
Battery Discharge Test
:
Over Temperature Test
The UPS also runs a series of over 20 internal tests when power is first
applied. If a diagnostic test fails, see Chapter 7, “Troubleshooting” on
page 73.
Battery Test on Demand
You can perform a battery test on the UPS while it is operating in
Normal mode by pressing the Output On button. The UPS
automatically distributes some of the load to the batteries for 30 seconds
and tests the battery’s performance.
Содержание Powerware Prestige Series 1500 VA
Страница 1: ...powerware Prestige Series 650 VA 1500 VA Installation and Operator s Manual for IBM Applications...
Страница 4: ...This page intentionally left blank...
Страница 101: ...89 Powerware Prestige Series Installation and Operator s Manual for IBM Applications 650 VA 1500 VA Uncontrolled Copy...