Installation
38
Powerware
®
Prestige Series Installation and Operator’s Manual for IBM Applications (650 VA - 1500 VA)
Uncontrolled Copy
Air
Exhausts
Breaker
Serial
Port
Input Connector (IEC 320-C14)
Battery Input Connector
Battery Output
Connector
External Battery Connector
Power Output
Receptacles
UPS Cabinet
Battery Cabinet
Battery Cable
Battery
Circuit Breaker
Breaker Tie
Figure 5. Typical UPS Rear Panel
UPS Startup for 120V Models
To start up the UPS for 120V models:
1.
If you are connecting the UPS to an AS/400, the QUPSDLYTIM
system value for the UPS Monitoring feature should be set. See
“UPS Monitoring” on page 54 for instructions.
2.
Plug the UPS power supply cord into the input connector on
the UPS rear panel.
3.
Plug the other end of the power supply cord into a grounded,
three-wire, AC receptacle that has been wired in accordance
with NEC specifications.
The UPS performs diagnostic tests and enters Normal mode
with the equipment (load) offline. The
indicator remains
lit. The startup should take about 15 seconds.
Содержание Powerware Prestige Series 1500 VA
Страница 1: ...powerware Prestige Series 650 VA 1500 VA Installation and Operator s Manual for IBM Applications...
Страница 4: ...This page intentionally left blank...
Страница 101: ...89 Powerware Prestige Series Installation and Operator s Manual for IBM Applications 650 VA 1500 VA Uncontrolled Copy...