Installation
40
Powerware
®
Prestige Series Installation and Operator’s Manual for IBM Applications (650 VA - 1500 VA)
Uncontrolled Copy
3.
Plug the UPS power supply cord into the input connector on
the UPS rear panel.
4.
Press and hold the Output
Off button while plugging the
other end of the power supply cord into a grounded, three-wire,
AC receptacle that has been wired in accordance with national
wiring rules.
Release the Output
Off button when the alarm beeps.
All indicators flash simultaneously.
5.
Press and hold the Output On button until the alarm beeps
again.
Two indicators, corresponding with the current setting, remain
flashing. The output voltage is factory-configured for 230V.
OVERLOAD
SITE FAULT
OVERTEMP
BATTERY
SELF TEST
220V
230V
240V
208V
Figure 6. Output Voltage Indicators
6.
Press the Output
Off button to scroll through the output
voltage options, top to bottom. Each time you press the button,
the UPS beeps and the next two indicators flash.
NOTE
If you do not save a selection within two minutes, the setup automatically
aborts and switches back to the original configuration.
7.
Press and hold the Output On button until the alarm beeps to
select and save the output voltage. Failure to release the button
immediately after the beep will cause the UPS to abort the
setup.
8.
Continue to Step 11.
9.
Plug the UPS power supply cord into the input connector on
the UPS rear panel.
10.
Plug the other end of the power supply cord into a grounded,
three-wire, AC receptacle that has been wired in accordance
with national wiring rules.
Содержание Powerware Prestige Series 1500 VA
Страница 1: ...powerware Prestige Series 650 VA 1500 VA Installation and Operator s Manual for IBM Applications...
Страница 4: ...This page intentionally left blank...
Страница 101: ...89 Powerware Prestige Series Installation and Operator s Manual for IBM Applications 650 VA 1500 VA Uncontrolled Copy...