background image

3

1   Introduction / Foreword

Installation and Operating Instructions  Web-Controller

   40071860236 (E)   February 2019   www.eaton.com

1   Introduction / Foreword

The  Web-Controller allows for comfortable and full 

control and monitoring for up to max. 800 self-

contained luminaires or modules. Many useful features are 

implemented.
The luminaires are connected via a 2 core bipolar buscable, 

subdivided on 4 or 2 lines (max. 200 luminaires on 4 lines or 

400 luminaires on 2 lines).
An integrated webserver allows an easy monitoring of all 

luminaires over an existing computer network, via a stan-

dard web browser, e.g. firefox. Thus a special software is not 

required and location independent monitoring is possible.
An optional PC-Software allows an comfotable con-

figuration of the  Web-Controller via an USB-cable 

connection.

The following features are available:

 

n

Housing for DIN rail mounting in a standard distribution 

cabinet

 

n

Up to 4 lines with max. 200 luminaires each, in total max. 

800 luminaires

 

n

Íntegrated webserver for a comfortable monitoring via 

standard webbrowser

 

n

Integrated mail client for up to 10 recipients, mail events 

freely selectable

 

n

Blocking input with differential loop monitoring  

(1 kOhm)

@

Web-Controller: With inte-

grated memory for storing the con-

Visualisation of up to 800 luminaires 

(4 lines with max. 200 luminaires each or   

2 lines with max. 400 luminaires each, only 

with homogeneous installation of  

luminaires)

CGVision software: Configuration 

and full visualisation of 32 x 800 

Network PC or  Wireless 

Monitoring Set (optional): Access to 

USB stick: For convenient logbook 

analysis at the PC

Up to 32 controllers with 800 

luminaires each (only with 

homogeneous installation of 

luminaires)

      ...

Ability to store the configu-

ration and logbook via USB 

stick

Line 1

Line 2

Line 3

Line 4

 

n

Two free programmable digital inputs

 

n

Two free programmable relay outputs (changeover con-

tacts)

 

n

Automatic luminaire search function (no manual address-

ing required)

 

n

Automatic function / duration test of all luminaires, 

assigned into 8 test groups

 

n

Luminaires with maintained light can be switched off, free 

selectable (in non-maintained light)

 

n

2 x USB ports,1 x for Backup via USB-stick, 1 x for easy con-

figuration via PC-software

 

n

Intergrated building layout programming with max. 30 lay-

outs (external software as option)

 

n

Downloadable logbooks

 

n

CGVision fully configuration and monitoring software for 

max. 32  Web-Controller available (as option)

 IMPORTANT 

The  Web-Controller is compatible with the older 

CGLine self-contained system. If one or more CGLine luminaire 

is connected, the controller switches automtically to CGLine 

compatibility modus. Some features are not available 

then.

 

NOTE 

For setting up the Adaptive Evacuation mode, please read the 

AE manual.

Fig . 1 .  Application example

Содержание CGLine+ Web-Controller

Страница 1: ...Installation and Operating Instructions CGLine Web Controller Target group Electrical specialists CGLine Web Controller...

Страница 2: ...EENS 13 7 1 Home start screen 13 7 2 Start screen after registration 14 7 3 Overview of all faulty luminaires complete overview 15 7 4 Overview of all faulty luminaires for each zone 16 7 5 Overview o...

Страница 3: ...lines with max 200 luminaires each or 2 lines with max 400 luminaires each only with homogeneous installation of CGLine luminaires CGVision software Configuration and full visualisation of 32 x 800 N...

Страница 4: ...policies O O Restrict Network Access Ideally CGLine Web Controller should be installed on a segregated network However when the CGLine Web Controller is connected to a wider network make sure that the...

Страница 5: ...technical regulations when setting up and operating electrical operating equipment 5 1 Assembly Observe impermissible temperatures at the installation loca tion during mounting The permissible ambient...

Страница 6: ...ctional method O O Press the service pin 1 sec but 3 sec function test started for all luminaires O O Press the service pin 6 sec only new luminaires search started 1 6 7 8 9 10 2 3 4 5 3 Push buttons...

Страница 7: ...Table 3 Cable length line Cross section Length Total lines 0 5 qmm 260 m 660 m 1 0 qmm 520 m 1320 m 1 5 qmm 800 m 2000 m Table 4 Electrical data line Power supply bus 25 V Max permissible voltage drop...

Страница 8: ...tandard PC Controller functions can be programmed via the PC and a configuration software e g luminaire configurations The PC configuration software is available optionally 6 First commissioning and m...

Страница 9: ...displayed Mark the entry Internet protocol version 4 1 then continue with Properties 2 Usually the network card is on DHCP i e Automatically reference IP address Modify the entry to Use the following...

Страница 10: ...o the address bar The start screen of the CGLine Web Controller opens The screen shows an over view of the installed CGLine system with sum status information To have access to the submenus a login 1...

Страница 11: ...tion 1 It is possible to change the network settings 1 6 5 Modifying of the language date and time To change the language to English please click on Configuration 1 in the register General 2 The langu...

Страница 12: ...via the names is possible The CGLine Web Controller is supplied with a factory set static IP address of 192 168 1 200 3 Operation via DHCP is possible but in this case it is recommended to select sta...

Страница 13: ...s User Admin Password EATON User User Password GUEST 1 The Admin Account allows full access to the CGLine Web Controller e g start function test The User account allows only access for monitoring the...

Страница 14: ...Yellow min 1 luminaire faulty O O Red min 3 luminaires faulty e g lamp failure After the login the navigation menu appears on the left side 1 O O Home The start screen is accessed via Home at any time...

Страница 15: ...ible to enter to the building layout picture if it is pre The menu Oveview 1 and the tab Overview luminaire failure 2 display all luminaires with a fault 3 O O L line no 1 4 O O Z zone 2 16 O O B lumi...

Страница 16: ...er 40071860236 E February 2019 www eaton com 7 4 Overview of all faulty luminaires for each zone All luminaires with a fault in a zone are displayed in the Overview menu 1 and the Zone tab 2 Via the d...

Страница 17: ...erview luminaires 2 shows all installed luminaires on the CGLine Web Controller 1 2 7 6 Information information text of the luminaires This screen shows the name with max 20 characters and information...

Страница 18: ...f luminaires addresses For changing the configuration of luminaires addresses please follow the steps below 1 Click on the tab Luminaires The table with all the luminaires installed appears 2 Click on...

Страница 19: ...uration tests are aborted O O Switch maintained mode ON OFF Luminaires in main tained mode L applied can be switched ON or OFF if luminaire supports this function O O Update luminaire status Actualisi...

Страница 20: ...st times On the Test tab 2 in the configuration menu 1 it is possible to determine start times for a function test and duration test for up to 8 groups It is also possible to set a test interval via w...

Страница 21: ...mode luminaires of the line as long as the input is active O O Start function test With positive pulse starts the function test with all luminaires O O Stop FT DT Interrupts a duration test or functi...

Страница 22: ...ally correct it is necessary after the commissioning to correctly set the date and 2 1 4 5 3 7 13 Network settings Follwing settings are possible O O DHCP Dynamic Host Control Protocol if a DHCP is in...

Страница 23: ...plete logbook is downloadable via log book dat This file is only usable with the CGLine PC software see manual CGLine PC software The CGLine Web Controller contains an integrated e mail client 1 that...

Страница 24: ...layouts of the building or areas It is possible to import up to 30 building layout plans with max 200 luminaires each The colour of the luminaire shows the status e g red luminaire failure To use this...

Страница 25: ...ding layouts can displayed now by the folder List of building layouts 1 With click on the name of the layout which is dis played as hyperlink with xml extension 2 the lay out can load from the con tro...

Страница 26: ...n there is a search func tion 1 2 This enables quickly finding any defective luminaires in a building To find a luminaire in the layout plan the line the zone and the luminaire to address can be selec...

Страница 27: ...e entered here After con firming via Add the devices are automatically created A device can be deleted from the list again via Delete 3 3 1 2 7 24 Overview all Web Controller With several installed CG...

Страница 28: ...ght solution for the application But decision makers demand more than just innovative products They turn to Eaton for an unwavering commitment to personal support that makes customer success a top pri...

Отзывы: