40
4 Construction and Function
Mounting and Operating Instructions CEAG Central Battery System ZB-S 40071860179 (L) November 2018 www.ceag.de
SOU CG-S 2x4 A
Fuses
On the front panel of the change-over module there are
O
O
2 output fuses 8 AT / 250 V.
The nominal current should not exceed 4 A!
Fuse dimensions: 6,3 mm x 32 mm, sand filled.
Order no.: 400 71 360 484 / 10 qty./unit
Indicators
O
O
ON LED
The LED lights up when the voltage is present at the output
terminals.
O
O
Failure LED
The LED lights up when one or more luminaires are faulty.
Operation elements
O
O
Service-PIN
Beside the „Service“ lable there is a button which must be
operated when the system´s basic program is loaded. The
basic programming occurs factory made.
Additional Features
O
O
Mixed operation of
maintained light, non-maintained light and switched
maintained light in one circuit by using of CEAG EVGs/
modules with V-CG-S marking can be programmed without
any additional data cable.
O
O
Individual monitoring of
up to 20 luminaires per circuit
O
O
Separate rental current feed
O
O
Easy access fo fuses
O
O
Connected rating per circuit
860W
O
O
Inrush current per circuit
250A/ms
NOTE
O
O
The new SOU modules for the system ZB-S have the ability,
also during breakdown of the controller CU CG-S, to achieve
the following switching functions:
O
O
Mains emergency operation (by breakdown CU CG-S)
O
O
DC-operation (by power failure)
O
O
back to the mains emergency operation (return of the
mains supply). Admittely, will be no switching functions
performed (e. g. by DLS module) during the breakdown
of controller!
ATTENTION!
Only fuses approved by CEAG
Notlichtsysteme GmbH are permit-
ted to use.
x2
x1
H3
x2
x1
H2
x2
x1
H1
8AT
L
L
L
N
L
PE
AV
L
L
L
N
L
PE
SV
+
-
1
2
3
4
1
2
3
4