32
Eaton 93E External Battery Cabinet Installation Manual P-164000057—Rev 05
3.
Install conduit between the UPS cabinet and the EBC. If installing a second EBC, install conduit between
the first and second EBCs.
4.
Route the battery cables (positive, negative, and ground) through the conduit on the back of EBC 1 to the
UPS DC and ground terminal blocks on EBC 1. See
or
for wiring access information
and terminal locations. See paragraph
, and
for wiring
and termination requirements.
WARNING
Verify polarity of connections. Risk of personal injury and damage to equipment from arc flash if connections
are reversed.
5.
Connect the positive and negative power wiring to the UPS DC (+) and UPS DC (-) terminals on EBC 1.
Connect the ground wiring to the ground terminal on EBC 1. See
or
.
6.
Route the other end of the battery cables (positive, negative, and ground) to the UPS cabinet external
battery input and ground terminals. Refer to the applicable Eaton 93E UPS Installation and Operation
manual listed in paragraph
for UPS cabinet terminal locations and termination
requirements.
7.
Connect the positive, negative, and ground power wiring to the UPS cabinet external battery input and
ground terminals. Refer to the applicable Eaton 93E UPS Installation and Operation manual listed in
paragraph
for UPS cabinet termination requirements.
8.
If installing a second EBC, proceed to
; otherwise, proceed to
9.
Route the battery cables (positive, negative, and ground) through the conduit on the back of EBC 2 to the
UPS DC and ground terminal blocks on EBC 2. See
or
for wiring access information
and terminal locations. See paragraph
, and
for wiring
and termination requirements.
10. Connect the positive and negative power wiring to the UPS DC (+) and UPS DC (-) terminals on EBC 2.
Connect the ground wiring to the ground terminal on EBC 2. See
or
.
11. Route the other end of the battery cables (positive, negative, and ground) to the DC IN and ground terminal
blocks on the EBC 1. See
or
for wiring access information and terminal locations. See
paragraph
, and
for wiring and termination
requirements.
12. Connect the positive and negative power wiring to the DC IN (+) and DC IN (-) terminals on EBC 1. Connect
the ground wiring to the ground terminal on EBC 1. See
or
13. Install the power terminal cover top using the provided hardware (see
).
14. Install the power terminal cover right and left sides using the provided hardware (see
).
15. Proceed to
.
16. Route the battery cables (positive, negative, and ground) to the EBC 1 UPS DC and ground terminal blocks.
See
or
for wiring access information and terminal locations. See paragraph
, and
for wiring and termination requirements.
17. Connect the positive and negative power wiring to the UPS DC (+) and UPS DC (-) terminals on EBC 1.
Connect the ground wiring to the ground terminal on EBC 1. See
or
.
NOTE
Do not tie wrap the DC battery cables to the AC input or output cables in the power
terminal cover base wiring channel. Place the DC battery cables at the bottom of the
channel.
18. Route the other end of the battery cables (positive, negative, and ground) through the EBC 1 and UPS
power terminal cover base wiring channels (see
) to the UPS cabinet external battery input and
Содержание 93E 30EBC
Страница 1: ...p n P 164000057 Revision 05 30EBC and 60EBC Installation Manual Eaton 93E External Battery Cabinet...
Страница 6: ...vi Eaton 93E External Battery Cabinet Installation Manual P 164000057 Rev 05 List of Figures...
Страница 8: ...viii Eaton 93E External Battery Cabinet Installation Manual P 164000057 Rev 05 List of Tables...
Страница 30: ...22 Eaton 93E External Battery Cabinet Installation Manual P 164000057 Rev 05 Installation Plan and Unpacking...
Страница 54: ...46 Eaton 93E External Battery Cabinet Installation Manual P 164000057 Rev 05 Onelines and Schematics...
Страница 60: ...P 16400005705 P 164000057 05...