Installation Checklist
Eaton
®
Power Xpert
®
9395C UPS Installation and Operation Manual P-164000821—Rev 01
www.eaton.com/powerquality
4-35
Installation Checklist
o
All packing materials and restraints have been removed from each cabinet.
o
Each cabinet in the UPS system is placed in its installed location.
o
Joining brackets are installed between the ISBM and PM sections.
o
Intercabinet power wiring is installed between the ISBM and PM sections.
o
Intercabinet interface wiring is installed between the ISBM and PM sections
o
A cabinet grounding/mounting kit is installed between the ISBM and PM sections.
o
All conduits and cables are properly routed to the UPS and any ancillary cabinets.
o
All power cables are properly sized and terminated.
o
Battery cables are terminated on E4 (+) and E5 (–).
o
Battery aux contact signal wiring is connected from the UPS to the battery disconnect.
o
Battery UVR signal wiring is connected from the UPS to the battery disconnect.
o
LAN drops are installed.
o
All LAN connections have been completed.
o
A ground conductor is properly installed.
o
Air conditioning equipment is installed and operating correctly.
o
The area around the installed UPS system is clean and dust-free. (It is recommended that the UPS be
installed on a level floor suitable for computer or electronic equipment.)
o
Adequate workspace exists around the UPS and other cabinets.
o
Adequate lighting is provided around all UPS equipment.
o
A 120 Vac service outlet is located within 7.5 meters (25 feet) of the UPS equipment.
o
The REPO device is mounted in its installed location and its wiring is terminated inside the UPS cabinet.
o
The normally-closed (NC) Emergency Power-off contact (pins 1 and 2 on TB1) is jumpered if not used.
o
Alarm relays and building alarms are wired appropriately. (OPTIONAL)
o
A remote battery disconnect is mounted in its installed location and its wiring is terminated inside the UPS.
(OPTIONAL)
o
Accessories are mounted in installed locations and wiring is terminated inside the UPS cabinet. (OPTIONAL)
o
The debris shields covering the UPS cabinet ventilation grills are removed.
o
Startup and operational checks are performed by an authorized Eaton Customer Service Engineer.
Содержание 9395C-1000/1000
Страница 2: ......
Страница 23: ...Section I Installation ...
Страница 24: ......
Страница 93: ...Section II Operation ...
Страница 94: ......
Страница 155: ......
Страница 156: ... P 164000821 1 P 164000821 1 ...