Installation
Eaton
®
Power Xpert
®
9395C UPS Installation and Operation Manual P-164000821—Rev 01
www.eaton.com/powerquality
4-3
2.
Remove the three bolts securing the left side shipping bracket to the cabinet and three bolts securing the
bracket to the pallet (see Figure 4-1 or Figure 4-5). Remove the left side shipping bracket.
3.
Remove the three bolts securing the right side shipping bracket to the cabinet and three bolts securing
the bracket to the pallet (see Figure 4-2 or Figure 4-6). Remove the right side shipping bracket.
Figure 4-1. Removing the ISBM Section Left Side Shipping Bracket
Shipping Bracket
Bolts
Shipping Bracket
Bolts
Pallet
Left Side Shipping
Bracket
Front Door
Содержание 9395C-1000/1000
Страница 2: ......
Страница 23: ...Section I Installation ...
Страница 24: ......
Страница 93: ...Section II Operation ...
Страница 94: ......
Страница 155: ......
Страница 156: ... P 164000821 1 P 164000821 1 ...