Operation
IPL350TD-1EN2.pdf
2012-06-18
Cleaning the machine
The machine should be cleaned with water at the end
of the day. Remove all residual milling material.
Lubricate bearings and support leg after cleaning.
Check that side shields, front shield and scraper are
properly secured and slide in their tracks without
jamming. Clean the tracks daily.
Do not spray water directly onto bearings and
electronic components!
Do not spray water directly onto bearings and
electronic components!
56
Содержание PL350 TD
Страница 2: ......
Страница 16: ...Safety Optional IPL350TD 1EN2 pdf 2012 06 18 8 ...
Страница 20: ...Special instructions IPL350TD 1EN2 pdf 2012 06 18 12 ...
Страница 66: ...Long term parking IPL350TD 1EN2 pdf 2012 06 18 58 ...
Страница 72: ...Preventive maintenance IPL350TD 1EN2 pdf 2012 06 18 64 ...
Страница 96: ...Maintenance 250h IPL350TD 1EN2 pdf 2012 06 18 88 ...
Страница 106: ...Dynapac Compaction Equipment AB Box 504 SE 371 23 Karlskrona Sweden ...
Страница 107: ...Dynapac Compaction Equipment AB Box 504 SE 371 23 Karlskrona Sweden ...