Long-term parking
4812158801_E.pdf
2018-04-03
Long-term parking
The following instructions should be followed
when long term parking (more than one month).
The following instructions should be followed
when long term parking (more than one month).
Fig. Roller weather protection
These measures apply when parking for a period of up
to 6 months.
Before re-commissioning the roller, the points marked
with an asterisk * must be returned to the pre-storage
state.
Wash the machine and touch up the paint finish to
avoid rusting.
Treat exposed parts with anti-rust agent, lubricate the
machine thoroughly and apply grease to unpainted
surfaces.
Engine
* Refer to the manufacturer’s instructions in the engine
manual that is supplied with the roller.
Battery
* Remove the battery from the machine. Clean the
battery, check that the electrolyte level is correct (see
under the heading 'Every 50 hours of operation') and
trickle-charge the battery once a month.
Air cleaner, exhaust pipe
* Cover the air cleaner (see under the heading 'Every
50 hours of operation' or 'Every 1000 hours of
operation') or its opening with plastic or tape. Also
cover the exhaust pipe opening. This is to avoid
moisture entering the engine.
Sprinkler system
* Drain the water tank completely (see under the
heading ‘Every 2000 hours of operation’). Drain all
hoses, filter housings and the water pump. Remove all
sprinkler nozzles (see under the heading ‘Every 10
hours of operation’).
Fuel tank
Fill the fuel tank completely full to prevent
condensation.
51
Содержание CC7200
Страница 2: ......
Страница 12: ...Introduction 4812158801_E pdf 2018 04 03 4...
Страница 18: ...Safety Optional 4812158801_E pdf 2018 04 03 10...
Страница 22: ...Special instructions 4812158801_E pdf 2018 04 03 14...
Страница 66: ...Operating instructions Summary 4812158801_E pdf 2018 04 03 58...
Страница 68: ...Preventive maintenance 4812158801_E pdf 2018 04 03 60...
Страница 76: ...Maintenance Maintenance schedule 4812158801_E pdf 2018 04 03 68...
Страница 88: ...Maintenance 50h 4812158801_E pdf 2018 04 03 80...
Страница 101: ...Dynapac Compaction Equipment AB Box 504 SE 371 23 Karlskrona Sweden www dynapac com...