88
VAPOR-LOGIC
®
VERSION 6 INSTALLATION AND OPERATION MANUAL
Multiple-tank operation
CHANGING A PRIORITY GROUP
To change a priority group, go to the Setup menu to access Multi-tank setup/
Tank priority group .
To add a tank to a multi-tank system:
1 . Verify that the new tank has the correct tank designator . Change, if
necessary, before wiring in Step 2 .
2 . Connect wiring of new tank .
3 . The master controller automatically adds the new tank’s capacity into the
total system capacity .
To permanently remove a tank from a multi-tank system:
1 . Disconnect control board wiring (location P8) of the tank being removed .
2 . Reset system capacity from the Multi-tank setup menu . The controller will
automatically calculate the new system capacity .
Important:
• Each tank in a multi-tank system must have a unique tank designator (A, B,
C . . . P) . Duplicate tank designations will cause multi-tank mode to operate
incorrectly .
• Each Vapor-logic board ships with a network IP address of 192 .168 .1 .195 .
When installing on an Ethernet network, assign each board a unique IP
address to avoid conflict with other devices on the network .
OTHER SYSTEM PARAMETERS AND INTEROPERABILITY
General system parameters are set the same as for stand-alone tank/controller .
See the Setup section of this manual for instructions .
MULTI-TANK OPERATION WITH WEB INTERFACE
If you plan to use the Web interface for multi-tank operation, the web interface
must first be configured, see "Web interface communication
"
OPERATION