8
VAPOR-LOGIC
®
VERSION 6 INSTALLATION AND OPERATION MANUAL
Pre-installation Checklist
☐
See Figure 8-1 for field terminal block locations . Note
that field wiring connection locations on the Vapor-logic
board are surrounded with a white border .
☐
See the figure on the next page for instructions on how
to make wiring connections .
☐
See the wiring drawings and manuals that shipped
with your humidifier .
☐
When making field connections, do not route low
voltage wires near line voltage wires . Do not route low
voltage wires in the same conduit as line voltage wires .
☐
Humidistat, room/duct transmitter, temperature sensor,
and airflow proving switch wiring must be minimum
18-gauge (1 mm
2
) plenum rated, shielded (screened),
twisted pair wire with a bare drain wire for grounding .
☐
Connect the shield (screen) wire [with a length less than
2" (50 mm)] to the shield (screen) ground terminal on
the electric subpanel . Do not ground the shield (screen)
wire on the humidistat or transmitter end .
☐
If you have a remote-mounted control cabinet, the
water level control device, thermal trip, safety interlock,
fill valve, and drain valve wiring must be minimum
18-gauge (1 mm
2
) stranded wire run in a conduit
separate from power wires .
Do not use shielded (screened) cable for water level
control devices .
When the control cabinet is mounted remotely from the
humidifier, connect a ground wire from the machine
ground lug on the humidifier to the machine ground lug
in the control cabinet . The bonding machine ground
wire should be the same AWG (mm
2
) as the largest
heater wire (electric humidifiers) or sized per local
code, National Electrical Code (NEC), or in Europe,
IEC 60364 requirements .
Board detail showing white border
Field connection terminals .
Terminals P-11 through P-16
have a white border on the
Vapor-logic board . This is
where you will make most of
your field wiring connections .
INSTALLATION
Field connection terminals .
FIGURE 8-1: VAPOR-LOGIC CONTROL BOARD DETAIL