17. Operation and Maintenance of Neon pR
Dr. A. Kuntze
I
Gutes Wasser mit System
Robert-Bosch-Str. 7a
40668 Meerbusch
+49 (0) 2150-7066-0 / Fax -60
www.kuntze.com
68
17. Operation and Maintenance of Neon pR
17.1. Mode
Never carry out maintenance while the controller is set to automatic. Select either
manual mode or Hold.
In the manual mode only the controller is deactivated. All other functions such as the
alarm relay and the test functions are still active. This mode is ideally suited to test
the wiring to your PLC and to check the alarm functions.
With Hold, all alarm functions are deactivated. This mode is ideally suited to carry out
maintenance such as calibration without issuing an alarm. With Hold, the controller is
deactivated, and all analog and digital outputs are frozen to the last value, in case
you are using these outputs as inputs for an external control.
17.2. Maintenance of the measurement
Maintenance of the measurement comprises cleaning of the various components,
regular testing of safety features and gaskets, regular exchange of consumables, and
with pH the regular calibration of the measurement.
Note
Maintenance intervals depend on the application, the installation,
the accuracy requirements etc.
Operation
Interval suggestion
Cleaning of sensors and assemblies
2 weeks
Refilling the KCl vessel
Depends on vessel size
Cleaning of valves, filters, tubing etc.
2 weeks
Calibration of the pH measurement
Weekly
Checking the gaskets
Weekly
Testing the safety features
2 weeks
Exchange of consumables
Six months / yearly