8. Menu Cal
– Calibration – pH
Dr. A. Kuntze
I
Gutes Wasser mit System
Robert-Bosch-Str. 7a
40668 Meerbusch
+49 (0) 2150-7066-0 / Fax -60
www.kuntze.com
37
8.1. Calibration - Run
Note
You can leave the calibration menu any time with ESC, and with
touch screen operation also with the HOME symbol.
Select the symbol RUN to start the calibration.
Put the pH sensor in the first buffer solution and press START. Default values for
the buffer solutions are pH 4 and pH 7. If you want to use other buffer solutions,
you have to change the calibration settings.
The automatic buffer recognition starts. When it is finished, the right window
shows the recognized buffer.
When the measured value stabilizes, or at the latest after 120 seconds, the
process bar is complete, and an OK button appears.
Note
If the measured value is still not quite stable after the 120 seconds,
as can be the case with older sensors, wait until it stabilizes, and
then press OK.
With the OK button you execute the first calibration point and reach the second
step of the calibration process.
Содержание Neon pR
Страница 1: ...Neon pR Dr A Kuntze manual...