Cafitesse 100 Next Generation
Functions - water system
August 2009
5A-5
8
10
9
Extract the 2 bolts (6) from the cavity on each
side of the inside wall and place it in the adjacent
hole to support the cooling compartment (fig. 4).
Disassembly of the outlet valves
Unplug the cable harness (7) of the respective
outlet valve at the intermediate connection (fig.
5).
Remove the convection hose (8) beneath the
respective outlet valve (fig. 6).
Pull off the breather hose (9) from the boiler lid
(fig. 6).
Pull off the outlet hoses (10) of the respective
outlet valve (fig. 6).
Turn the respective valve (11) counterclockwise
and downwards and take it out of the bracket
(fig. 7).
•
•
•
•
•
•
Fig. 4
Fig. 5
Fig. 7
11
Fig. 6
7
6
Содержание Cafitesse 110
Страница 1: ...DRAFT Version August 2009 D R A F T Service Manual Cafitesse 110 Cafitesse 120 Next Generation ...
Страница 2: ... 2009 Douwe Egberts Coffee Systems International DRAFT Version August 2009 D R A F T ...
Страница 22: ...D R A F T Cafitesse 100 Next Generation Installation Putting into operation 2 20 August 2009 ...
Страница 54: ...Cafitesse 100 Next Generation Programming 4 20 August 2009 ...
Страница 58: ...D R A F T Cafitesse 100 Next Generation Functions Overview of assemblies 5 August 2009 ...
Страница 71: ...Cafitesse 100 Next Generation Functions water system August 2009 5A 13 ...
Страница 82: ...Cafitesse 100 Next Generation Functions dosing system 5C 10 August 2009 ...
Страница 83: ...Cafitesse 100 Next Generation Functions housing August 2009 5G 1 G Housing G 1 Adjustments Not available here ...
Страница 93: ......