9.3.8 Replace paint pipe
Personnel:
Operator
+ additional qualification high tension
technology
+ additional qualification explosion pro-
tection
Protective equipment:
Protective workwear
Anti-Static Safety Boots
Requirements:
Disassembly
Fig. 42: Disassemble cover
1. Loosen cover (1) with open-end wrench
SW22.
Fig. 43: Loosen nuts
2. Loosen the nuts (2, 4) with the supplied
open-end wrench (included in the tool
kit).
3. Remove paint pipe (3).
Fig. 44: Replace plug sleeve
4. Replace plug sleeve (5).
Assembly
5. Insert paint pipe (3).
6. Tighten nuts (2, 4).
7. Tighten cover (1).
Faults
11/2019
EcoGun AS MAN EC - MSG00022EN
33/52