27
DUAL CLIMA R
6.6.2
Main board connection
The main board is supplied inside the heat pump. Before start-up, it must be connected to the machine.
To do this, first install the moan board inside the house and pass the cable that is supplied to this
location (located near the sensor bundle). Finally, the connectors of the cable and the main board
should be connected at their ends.
The cable supplied with the heat pump is 5 meters long. If necessary, it can be extended to a maximum
distance of 100 meters (section between 0.5 ÷ 1.25 mm
2
).
IMPORTANT: Before carrying out any work on the electrical installation of the heat pump,
always ensure it is disconnected from the mains.
6.6.3
Connecting the DHW tank sensor
When installing an DHW tank in combination with the heat pump, a temperature sensor must be
installed in the accumulator. By means of this sensor, the electronic controller of the heat pump will be
able to manage the temperature of the DHW, activating the DHW mode when the temperature of the
accumulator falls below the desired temperature.
A DHW tank sensor is supplied within the
DUAL CLIMA R
heat pump. This sensor is located in the
documentation bag, inside the machine and is identified as
"DHW TANK SENSOR"
. The electrical
connection of the sensor will be made between terminals
TH7
of the inputs terminal strip of the heat
pump. Before connecting, it will be necessary to remove the resistance connected from factory in these
terminals. To install it, release the sensor from the bundle, take it to where the DHW tank is located,
and insert it into the sensor housing provided in it.
The sensor supplied with the heat pump is 5 meters long. If necessary, it can be extended to a
maximum distance of 50 meters (section between 0.5 ÷ 1.25 mm
2
).
IMPORTANT: Before carrying out any work on the electrical installation of the heat pump,
always ensure it is disconnected from the mains.
CN16
TH
3
T
H
4
TH
5
T
H
6
TH
7
T
H
8
TH
9
T
H
1
0
T
H1
1
T
H
1
2
TH
1
3
TH
1
4
TH16
TH17 DIN1 DIN2 DIN3 DIN4 DIN5 DIN6 DIN7 DIN8 DIN9
CN4
7
CN
28
CN2
7
CN4
9
CN1
6
C
N1
7
8
7
6
5
4
3
2
1
ON
DI
P
TH
1
T
H
2
CN17
1
6
TH7
A
B
TH7 TH8TH8
Содержание DUAL CLIMA R
Страница 1: ...DUAL CLIMA R Air to Water Heat Pump EN INSTALLATION AND OPERATION INSTRUCTIONS ...
Страница 54: ...EN 54 DUAL CLIMA R 14 2 Dual Clima 6R ...
Страница 55: ...55 DUAL CLIMA R 14 3 Dual Clima 9R ...
Страница 56: ...EN 56 DUAL CLIMA R 14 4 Dual Clima 12R ...
Страница 57: ...57 DUAL CLIMA R 14 5 Dual Clima 16R ...
Страница 58: ...EN 58 DUAL CLIMA R 14 6 Dual Clima 19R ...
Страница 59: ...59 DUAL CLIMA R 14 7 Dual Clima 16RT ...
Страница 60: ...EN 60 DUAL CLIMA R 14 8 Dual Clima 19RT ...
Страница 69: ...69 DUAL CLIMA R DUAL CLIMA 9R ...
Страница 70: ...EN 70 DUAL CLIMA R DUAL CLIMA 12R ...
Страница 71: ...71 DUAL CLIMA R DUAL CLIMA 16R ...
Страница 72: ...EN 72 DUAL CLIMA R DUAL CLIMA 19R ...
Страница 73: ...73 DUAL CLIMA R DUAL CLIMA 16RT ...
Страница 74: ...EN 74 DUAL CLIMA R DUAL CLIMA 19RT ...
Страница 81: ...81 DUAL CLIMA R NOTES ...
Страница 82: ...EN 82 DUAL CLIMA R NOTES ...
Страница 83: ...83 DUAL CLIMA R NOTES ...