5
Axle and Wheel Installation
Check all parts have been delivered.
Wheels, axles, axle mounting bolts.
Delivery includes 2 left wheels and 2
right wheels.
Install the wheels on the axles.
Note: Only ‘TerraTrac’ are directional
tires!!
They must be installed in “trailed"
mode as shown.
Position the axles flat on wooden
blocks and remove the wheel bolts.
Place the wheels onto the axles
ensuring the air valves face upwards.
Use a tire lifting tool OR two people to
place the tire onto the axle.
Install the 6 bolts by hand.
Tighten the 6 bolts to 120lb-ft (163
N.m.). Wheel torque should be check
after the first hour and every 20h for
the first 60h.
Repeat for all wheels.
Air valve facing upwards
Front of harvester