18
Operating instructions
•
DINO 160XTB
•
180XTB
•
210XTB
The initial inspection and test loading of the Dino aerial work platforms is performed by the
manufacturer. A protocol, drawn up during the inspection, will accompany the lift.
The protocols of the start-up and periodic inspections must be kept with the lift or its
immediate proximity for at least five years.
E. ELECTRIC APPLIANCES
G. SAFETY DEVICE
1. Electric appliances
1. Safety limit switch
2. Sound signal
F. CONTROL DEVICES
1. Protections
H. LOADING TEST
2. Symbols / directions
1.Dynamic = 237 kg
3. Placings
2. Static = 323 kg
4. Emergency stop
3. Work movements
FAILINGS AND NOTES
Failings have been repaired.
Date:
Signature:
Dinolift Oy
Raikkolantie 145
FIN-32210 LOIMAA, FINLAND
Tel. +358 - 20 - 1772 400, Fax +358 - 2 - 7627 160, e-mail: [email protected]
Содержание DINO 210XTB II
Страница 2: ......
Страница 9: ...9 2 1 DIMENSION DRAWINGS 2 1 1 160 XTB II...
Страница 10: ...10 Operating instructions DINO 160XTB 180XTB 210XTB 2 1 2 180 XTB II...
Страница 11: ...11 2 1 3 210 XTB II...
Страница 52: ...52 Operating instructions DINO 160XTB 180XTB 210XTB NOTES...
Страница 53: ...53 NOTES...
Страница 57: ...57 7 2 LUBRICATION PLAN 6 9 7 11 7 8 1 5 5 3 2 12 3 4 10 13...
Страница 61: ...61 BLANK...
Страница 64: ...64 Operating instructions DINO 160XTB 180XTB 210XTB BLANK...
Страница 66: ...66 Operating instructions DINO 160XTB 180XTB 210XTB NOTES...
Страница 67: ...67 NOTES...