
33
37
21
18
18
23
30
35
36
22
4.3.4. Operating controls in platform control centre UCB
Close the cover of the chassis control centre before operating the controls on the platform.
The cover must not be locked while the lift is in operation.
The motor starts and stops automatically, as the movement is activated.
18 Signal lights
30
Lever switch for turning the platform
(used simultaneously with pushbutton
35)
Green – inside the allowed outreach range
Red – at the border of the allowed outreach
range
35 Levelling of the platform (pushbutton)
21 Pushbutton, retracting the telescope
36
Lever switch for levelling the platform
(used simultaneously with pushbutton
35)
22 Emergency stop
- push to stop
37
Signal light for battery voltage. Recharge
the batteries when the signal light lights
up. At the same time relay K6 stops
telescope extension and boom lifting
movements.
- pull to reset
23 Sound signal button
24 Socket outlet 230VAC/ (2 pcs.)
Содержание DINO 210XTB II
Страница 2: ......
Страница 9: ...9 2 1 DIMENSION DRAWINGS 2 1 1 160 XTB II...
Страница 10: ...10 Operating instructions DINO 160XTB 180XTB 210XTB 2 1 2 180 XTB II...
Страница 11: ...11 2 1 3 210 XTB II...
Страница 52: ...52 Operating instructions DINO 160XTB 180XTB 210XTB NOTES...
Страница 53: ...53 NOTES...
Страница 57: ...57 7 2 LUBRICATION PLAN 6 9 7 11 7 8 1 5 5 3 2 12 3 4 10 13...
Страница 61: ...61 BLANK...
Страница 64: ...64 Operating instructions DINO 160XTB 180XTB 210XTB BLANK...
Страница 66: ...66 Operating instructions DINO 160XTB 180XTB 210XTB NOTES...
Страница 67: ...67 NOTES...