DINO 105T
49
DAILY INSPECTION (START-UP INSPECTION)
To be always performed at a new work site and in the beginning of every working day.
The inspection is performed by the user. In the inspection attention shall be paid to the following
issues:
-
establish the load-bearing capacity of the ground at the lifting site (see the guidelines in the
table "maximum permissible ground pressure for different soil materials" on page 17)
-
verify the standing stability of the lift.
-
control the due operation of the level display.
-
test the operation of the emergency stop system both from the platform and the chassis control
panels.
-
test the operation of the emergency descent system
-
test the alarm signal.
-
check the warning and signal lights.
-
check the operation and cleanliness of the lights and reflectors.
-
check the condition of the operating controls and test the working movements.
-
check the condition of the access routes, the platform gate and the handrails.
-
check the operation of the limit switches, which block the boom movements (refer to the service
instructions).
-
check the operation of the limit switches, which block the outrigger movements (refer to the service
instructions).
-
check the hydraulic connections for leaks.
-
test the brakes.
-
check the structure visually.
-
observe the location of nearby power lines (refer to the safety distances on page 9)
Содержание DINO 105T
Страница 2: ...DINO 105T 2...
Страница 3: ...DINO 105T 3 OPERATING INSTRUCTIONS...
Страница 4: ...DINO 105T 4 Valid from serial number 5336...
Страница 8: ...DINO 105T 8 REACH DIAGRAM 120 kg...
Страница 34: ...DINO 105T 34 LUBRICATION PLAN...
Страница 37: ...DINO 105T 37...
Страница 69: ...DINO 105T 69 ELECTRIC DIAGRAM 5336...
Страница 70: ...DINO 105T 70...
Страница 71: ...DINO 105T 71...
Страница 72: ...DINO 105T 72...
Страница 73: ...DINO 105T 73...
Страница 74: ...DINO 105T 74...
Страница 75: ...DINO 105T 75 Notes...
Страница 77: ...DINO 105T 77 HYDRAULIC DIAGRAM 5336...
Страница 78: ...DINO 105T 78 Notes...