
DINO 105T
40
REGULAR SERVICING
The lift shall be serviced regularly at intervals of 11 -12 month.
Under demanding conditions where moist, corrosive substances or corrosive climate may speed up the
deterioration of the structure and induce malfunctions, the inspection must be performed more often
and the influence of corrosion and malfunctions must be reduced by using appropriate protective
means.
Only technical specialists who are familiar with the structure and the operation of the lift are allowed
to maintain the lift.
We recommend to turn to the service personnel of the dealer.
SCHEDULE FOR REGULAR SERVICING
1.
Clean the lift thoroughly before the service
-
The hydraulic and electric appliances must not be dismantled if they are not clean. Any
contaminants in the system may cause malfunctions later on.
-
Wash the lift externally.
NOTE! Be careful not to direct the high-pressure water jet straight to the electric appliances, such as
the control panels on the chassis and on the platform, relays, solenoid valves and limit switches.
-
use pressure air to dry the electric devices, hydraulic connectors etc. before opening them.
-
apply appropriate moisture repellent to the electric appliances after the drying.
-
always protect the piston rods with e.g. CRC3-36 anti-corrosive agent after washing with a
solvent.
REMEMBER CLEANLINESS!
Содержание DINO 105T
Страница 2: ...DINO 105T 2...
Страница 3: ...DINO 105T 3 OPERATING INSTRUCTIONS...
Страница 4: ...DINO 105T 4 Valid from serial number 5336...
Страница 8: ...DINO 105T 8 REACH DIAGRAM 120 kg...
Страница 34: ...DINO 105T 34 LUBRICATION PLAN...
Страница 37: ...DINO 105T 37...
Страница 69: ...DINO 105T 69 ELECTRIC DIAGRAM 5336...
Страница 70: ...DINO 105T 70...
Страница 71: ...DINO 105T 71...
Страница 72: ...DINO 105T 72...
Страница 73: ...DINO 105T 73...
Страница 74: ...DINO 105T 74...
Страница 75: ...DINO 105T 75 Notes...
Страница 77: ...DINO 105T 77 HYDRAULIC DIAGRAM 5336...
Страница 78: ...DINO 105T 78 Notes...