DINO 240RXT
75
F11:
Module XS-A0 10A (PK).
F12:
Module XS-A0 10A (PK).
XP-A0
Power supply unit.
Bus module used for controlling the propo valves and relays and as a connection terminal for the
sensors.
XS-A0:
Signal unit:
Bus module used for controlling the relays and as a connection terminal for the sensors.
20.2 CONTROL CENTRE 2 (OK2)
S1:
Locking EMERGENCY STOP button.
Stops all other functions except the emergency descent and the sound signal, which remain
operational.
S13:
Non-locking start button for emergency descent.
S16:
Non-locking control switch for "swing right - left" on the chassis control panel.
S17:
Non-locking control switch for "boom up - down" on the chassis control panel.
S18:
Non-locking control switch for "telescope in - out" on the chassis control panel.
S19:
Non-locking control switch for "articulated arms up - down" on the chassis control panel.
S20:
Non-locking switch for levelling of the platform.
S30:
Retracting the telescope After the SR3 has tripped, the telescope can be retracted by depressing the
button.
Q2: Switch lock:
Operation is only possible in the same operating position where the lift was started.
Position 0 = all electricity switched off
Position 1 = switches on the voltage to the control circuit of the main relay, the normal
operating position.
Position 2 = switches on the engine glowing.
Position 3 = start
H3:
Signal light. The alarm display, the reason can be checked on the MDM display on the platform
control panel.
H6:
Signal light. The signal light for engine glowing, the light is illuminated as the key switch is turned
to position Glowing.
The light only indicates that the key is in the glowing position, not e.g. how for long the glowing
current has been on.
Содержание 240RXT
Страница 2: ...DINO 240RXT 2...
Страница 3: ...DINO 240RXT 3 ORIGINAL OPERATING INSTRUCTIONS Valid from serial number 24040...
Страница 7: ...DINO 240RXT 7 2 REACH DIAGRAM...
Страница 8: ...DINO 240RXT 8 3 DIMENSION DRAWING...
Страница 18: ...DINO 240RXT 18 S20 S18 S17 S19 S16 Q2 H6 H3 S30 S13 S1 OK2...
Страница 20: ...DINO 240RXT 20 OK1 Q1 S11 S12 S31 S26 MDM S25 S22 S23 S24 S21 F13 S29 S27 S4 H1 H5 AD H4 LX A1 LX A0 PR...
Страница 36: ...DINO 240RXT 36 Notes...
Страница 39: ...DINO 240RXT 39 17 3 LUBRICATION PLAN...
Страница 41: ...DINO 240RXT 41 1...
Страница 58: ...DINO 240RXT 58 Notes...
Страница 60: ...DINO 240RXT 60 18 2 SAMPLE OF INSPECTION PROTOCOL FOR THE ACCESS PLATFORM...
Страница 61: ...DINO 240RXT 61...
Страница 83: ...DINO 240RXT 83 21 ELECTRIC DIAGRAM 24021...
Страница 84: ...DINO 240RXT 84...
Страница 85: ...DINO 240RXT 85...
Страница 86: ...DINO 240RXT 86...
Страница 87: ...DINO 240RXT 87...
Страница 88: ...DINO 240RXT 88...
Страница 89: ...DINO 240RXT 89...
Страница 90: ...DINO 240RXT 90...
Страница 91: ...DINO 240RXT 91...
Страница 92: ...DINO 240RXT 92...
Страница 93: ...DINO 240RXT 93...
Страница 94: ...DINO 240RXT 94...
Страница 95: ...DINO 240RXT 95...
Страница 96: ...DINO 240RXT 96...
Страница 97: ...DINO 240RXT 97...
Страница 98: ...DINO 240RXT 98...
Страница 99: ...DINO 240RXT 99...
Страница 100: ...DINO 240RXT 100...
Страница 101: ...DINO 240RXT 101...
Страница 102: ...DINO 240RXT 102...
Страница 103: ...DINO 240RXT 103...
Страница 104: ...DINO 240RXT 104...
Страница 105: ...DINO 240RXT 105...
Страница 106: ...DINO 240RXT 106...
Страница 107: ...DINO 240RXT 107 Notes...
Страница 110: ...DINO 240RXT 110 24 HYDRAULIC DIAGRAM BOOM OPERATION No 24013...
Страница 112: ...DINO 240RXT 112 26 HYDRAULIC DIAGRAM BOOM OPERATION WITH OPTIONAL EQUIPMENT No 24010...
Страница 113: ...DINO 240RXT 113 Notes...