![Dinolift 240RXT Скачать руководство пользователя страница 64](http://html1.mh-extra.com/html/dinolift/240rxt/240rxt_operating-instructions-manual_2505807064.webp)
DINO 240RXT
64
18.5 ANNUAL INSPECTION (REGULAR INSPECTION)
The inspection shall be performed by a skilled technician or an expert inspection body with
documented evidence of competence (see point “Inspections”). In the inspection special attention
has to be paid to the condition of the steel structures, the safety devices and the operating system.
Clean the lift before the inspection
The inspection incorporates the following measures and checks:
-
perform the measures of the daily and monthly inspection
-
inspect thoroughly the hydraulic system
-
power unit
-
connect the pressure gauge to the measuring point in the hydraulic
system
-
make the oil flow through the relief valve by driving one of the
movements against the end stop
-
observe the pressure reading in the gauge; when the oil is warm the
pressure should be 20 - 20,5 MPa (200 -205 bar)
-
load-holding check-valves on the outriggers
-
lift the device off the ground with the outriggers and measure the distance
to the chassis at each outrigger
-
step on the platform and extend the telescope keeping the boom level
Turn the boom round a few times, stop at the initial position and check
that the distance between the ground and the outriggers has not changed.
-
lift the outriggers from the ground and leave them in this position for
about 10 minutes
Observe that the outriggers do not lower of themselves.
-
load regulation valve of the lifting cylinder
-
lift the boom from the chassis control panel to an angle of about 45° and
extend the telescope
Observe about 10 minutes that the boom does not lower of itself.
-
load regulation valve of the telescope cylinder
-
lift the boom from the chassis control panel and extend the telescope
slightly; leave it in this position for about 5 minutes
-
make sure that the telescope does not retract of itself
-
load regulation valve of the levelling system
-
put a load of about 80 kg on the platform
-
lift and lower the boom 4 - 5 times
-
make sure that the position of the platform does not change
-
electric directional valves
-
operate all boom and turning movements and check that they all work
properly and that the movements stop as soon as the levers are released
Содержание 240RXT
Страница 2: ...DINO 240RXT 2...
Страница 3: ...DINO 240RXT 3 ORIGINAL OPERATING INSTRUCTIONS Valid from serial number 24040...
Страница 7: ...DINO 240RXT 7 2 REACH DIAGRAM...
Страница 8: ...DINO 240RXT 8 3 DIMENSION DRAWING...
Страница 18: ...DINO 240RXT 18 S20 S18 S17 S19 S16 Q2 H6 H3 S30 S13 S1 OK2...
Страница 20: ...DINO 240RXT 20 OK1 Q1 S11 S12 S31 S26 MDM S25 S22 S23 S24 S21 F13 S29 S27 S4 H1 H5 AD H4 LX A1 LX A0 PR...
Страница 36: ...DINO 240RXT 36 Notes...
Страница 39: ...DINO 240RXT 39 17 3 LUBRICATION PLAN...
Страница 41: ...DINO 240RXT 41 1...
Страница 58: ...DINO 240RXT 58 Notes...
Страница 60: ...DINO 240RXT 60 18 2 SAMPLE OF INSPECTION PROTOCOL FOR THE ACCESS PLATFORM...
Страница 61: ...DINO 240RXT 61...
Страница 83: ...DINO 240RXT 83 21 ELECTRIC DIAGRAM 24021...
Страница 84: ...DINO 240RXT 84...
Страница 85: ...DINO 240RXT 85...
Страница 86: ...DINO 240RXT 86...
Страница 87: ...DINO 240RXT 87...
Страница 88: ...DINO 240RXT 88...
Страница 89: ...DINO 240RXT 89...
Страница 90: ...DINO 240RXT 90...
Страница 91: ...DINO 240RXT 91...
Страница 92: ...DINO 240RXT 92...
Страница 93: ...DINO 240RXT 93...
Страница 94: ...DINO 240RXT 94...
Страница 95: ...DINO 240RXT 95...
Страница 96: ...DINO 240RXT 96...
Страница 97: ...DINO 240RXT 97...
Страница 98: ...DINO 240RXT 98...
Страница 99: ...DINO 240RXT 99...
Страница 100: ...DINO 240RXT 100...
Страница 101: ...DINO 240RXT 101...
Страница 102: ...DINO 240RXT 102...
Страница 103: ...DINO 240RXT 103...
Страница 104: ...DINO 240RXT 104...
Страница 105: ...DINO 240RXT 105...
Страница 106: ...DINO 240RXT 106...
Страница 107: ...DINO 240RXT 107 Notes...
Страница 110: ...DINO 240RXT 110 24 HYDRAULIC DIAGRAM BOOM OPERATION No 24013...
Страница 112: ...DINO 240RXT 112 26 HYDRAULIC DIAGRAM BOOM OPERATION WITH OPTIONAL EQUIPMENT No 24010...
Страница 113: ...DINO 240RXT 113 Notes...