DINO 240RXT
31
12 EMERGENCY DESCENT SYSTEM
As a precaution against possible power failure, the lift is equipped with a battery operated emergency
descent system.
1. Setup of the system
-
battery 12V 68 Ah
-
hydraulic unit 12 VDC
-
(automatic carger of the battery 12VDC 3A, on the model powered by electric motor )
2. The hydraulic unit comprises:
-
pressure relief valve, set value 16 MPa (160 bar)
-
check valve
-
direct current motor 800W
Start the emergency descent system from the pushbutton S11 on the platform or S13 on the chassis.
The emergency descent system can only be operated when the pushbutton is depressed.
Retracting the boom using the emergency descent system
When the emergency descent button is depressed
1.
The emergency descent unit starts
2.
The telescope automatically starts to retract.
3.
The boom and the articulated arm system start to lower simultaneously, after the telescope has been
fully retracted.
The emergency descent system can also be used for raising the support outriggers to the transport
position
The emergency descent unit starts when the pushbutton S32 on the chassis control panel is depressed.
At the same time the pushbutton at the end of the outrigger control valve is depressed whereupon the
outrigger starts to rise.
If the emergency descent system does not operate try to warn other personnel present on the site so that
they can make the lift engine or the emergency descent unit operational by, for example, changing the
battery.
Always check the condition of the emergency descent system battery before putting the lift into
operation.
Содержание 240RXT
Страница 2: ...DINO 240RXT 2...
Страница 3: ...DINO 240RXT 3 ORIGINAL OPERATING INSTRUCTIONS Valid from serial number 24040...
Страница 7: ...DINO 240RXT 7 2 REACH DIAGRAM...
Страница 8: ...DINO 240RXT 8 3 DIMENSION DRAWING...
Страница 18: ...DINO 240RXT 18 S20 S18 S17 S19 S16 Q2 H6 H3 S30 S13 S1 OK2...
Страница 20: ...DINO 240RXT 20 OK1 Q1 S11 S12 S31 S26 MDM S25 S22 S23 S24 S21 F13 S29 S27 S4 H1 H5 AD H4 LX A1 LX A0 PR...
Страница 36: ...DINO 240RXT 36 Notes...
Страница 39: ...DINO 240RXT 39 17 3 LUBRICATION PLAN...
Страница 41: ...DINO 240RXT 41 1...
Страница 58: ...DINO 240RXT 58 Notes...
Страница 60: ...DINO 240RXT 60 18 2 SAMPLE OF INSPECTION PROTOCOL FOR THE ACCESS PLATFORM...
Страница 61: ...DINO 240RXT 61...
Страница 83: ...DINO 240RXT 83 21 ELECTRIC DIAGRAM 24021...
Страница 84: ...DINO 240RXT 84...
Страница 85: ...DINO 240RXT 85...
Страница 86: ...DINO 240RXT 86...
Страница 87: ...DINO 240RXT 87...
Страница 88: ...DINO 240RXT 88...
Страница 89: ...DINO 240RXT 89...
Страница 90: ...DINO 240RXT 90...
Страница 91: ...DINO 240RXT 91...
Страница 92: ...DINO 240RXT 92...
Страница 93: ...DINO 240RXT 93...
Страница 94: ...DINO 240RXT 94...
Страница 95: ...DINO 240RXT 95...
Страница 96: ...DINO 240RXT 96...
Страница 97: ...DINO 240RXT 97...
Страница 98: ...DINO 240RXT 98...
Страница 99: ...DINO 240RXT 99...
Страница 100: ...DINO 240RXT 100...
Страница 101: ...DINO 240RXT 101...
Страница 102: ...DINO 240RXT 102...
Страница 103: ...DINO 240RXT 103...
Страница 104: ...DINO 240RXT 104...
Страница 105: ...DINO 240RXT 105...
Страница 106: ...DINO 240RXT 106...
Страница 107: ...DINO 240RXT 107 Notes...
Страница 110: ...DINO 240RXT 110 24 HYDRAULIC DIAGRAM BOOM OPERATION No 24013...
Страница 112: ...DINO 240RXT 112 26 HYDRAULIC DIAGRAM BOOM OPERATION WITH OPTIONAL EQUIPMENT No 24010...
Страница 113: ...DINO 240RXT 113 Notes...