DINO 240RXT
62
18.3 DAILY INSPECTION (START-UP INSPECTION)
To be always performed at a new work site and in the beginning of every working day. The
inspection is performed by the user. In the inspection attention shall be paid to the following
issues:
-
establish the load-bearing capacity of the ground at the lifting site (see the normative table
"Maximum permissible ground pressure for different soil materials" in point “Start-up”)
-
verify the standing stability of the lift
-
control the due operation of the position indicator
-
test the operation of the emergency stop system both from the platform and the chassis control
panels.
-
test the operation of the emergency descent system both from the platform and the chassis
control panels
-
test the alarm signal
-
check the warning and signal lights
-
check the condition of the operating controls and test all work movements
-
check the condition of the access routes, the platform gate and the handrails
-
check the operation of the outreach limit switch RK4 (see service instructions)
-
check the operation of the limit switches, which block the boom movements (see service
instructions)
-
check the operation of the limit switches, which block the operation of the outriggers (see service
instructions)
-
check the hydraulic system for tightness
-
test the brakes
-
check the unit visually
-
observe the location of nearby power lines (see point "General safety regulations")
Содержание 240RXT
Страница 2: ...DINO 240RXT 2...
Страница 3: ...DINO 240RXT 3 ORIGINAL OPERATING INSTRUCTIONS Valid from serial number 24040...
Страница 7: ...DINO 240RXT 7 2 REACH DIAGRAM...
Страница 8: ...DINO 240RXT 8 3 DIMENSION DRAWING...
Страница 18: ...DINO 240RXT 18 S20 S18 S17 S19 S16 Q2 H6 H3 S30 S13 S1 OK2...
Страница 20: ...DINO 240RXT 20 OK1 Q1 S11 S12 S31 S26 MDM S25 S22 S23 S24 S21 F13 S29 S27 S4 H1 H5 AD H4 LX A1 LX A0 PR...
Страница 36: ...DINO 240RXT 36 Notes...
Страница 39: ...DINO 240RXT 39 17 3 LUBRICATION PLAN...
Страница 41: ...DINO 240RXT 41 1...
Страница 58: ...DINO 240RXT 58 Notes...
Страница 60: ...DINO 240RXT 60 18 2 SAMPLE OF INSPECTION PROTOCOL FOR THE ACCESS PLATFORM...
Страница 61: ...DINO 240RXT 61...
Страница 83: ...DINO 240RXT 83 21 ELECTRIC DIAGRAM 24021...
Страница 84: ...DINO 240RXT 84...
Страница 85: ...DINO 240RXT 85...
Страница 86: ...DINO 240RXT 86...
Страница 87: ...DINO 240RXT 87...
Страница 88: ...DINO 240RXT 88...
Страница 89: ...DINO 240RXT 89...
Страница 90: ...DINO 240RXT 90...
Страница 91: ...DINO 240RXT 91...
Страница 92: ...DINO 240RXT 92...
Страница 93: ...DINO 240RXT 93...
Страница 94: ...DINO 240RXT 94...
Страница 95: ...DINO 240RXT 95...
Страница 96: ...DINO 240RXT 96...
Страница 97: ...DINO 240RXT 97...
Страница 98: ...DINO 240RXT 98...
Страница 99: ...DINO 240RXT 99...
Страница 100: ...DINO 240RXT 100...
Страница 101: ...DINO 240RXT 101...
Страница 102: ...DINO 240RXT 102...
Страница 103: ...DINO 240RXT 103...
Страница 104: ...DINO 240RXT 104...
Страница 105: ...DINO 240RXT 105...
Страница 106: ...DINO 240RXT 106...
Страница 107: ...DINO 240RXT 107 Notes...
Страница 110: ...DINO 240RXT 110 24 HYDRAULIC DIAGRAM BOOM OPERATION No 24013...
Страница 112: ...DINO 240RXT 112 26 HYDRAULIC DIAGRAM BOOM OPERATION WITH OPTIONAL EQUIPMENT No 24010...
Страница 113: ...DINO 240RXT 113 Notes...