DINO 240RXT
68
18.7 TEST LOADING INSTRUCTIONS FOR REGULAR INSPECTION
1.
Place the lift on an even surface with good carrying capacity. Drive the outriggers to their lowest
position (the minimum support width).
2.
Raise the boom, turn it to the side from the transport support and lower it to the ground.
3.
Put a weighed load of 215 kg on the platform (I).
4.
Lift the boom to as high as it goes and extend the telescope to its full length (maximum lifting
height).
5.
Lower the boom until the safety device stops the movement.
6.
Turn the boom round over 360°.
7.
Retract the telescope and lower the boom to a horizontal position.
8.
Extend the telescope until the safety limit switch RK4 stops the movement. Establish the standing
stability in this situation by turning the lift round over 360°.
9.
Carry out the same procedure with a platform load of 80 kg (II).
10.
Compare the outreach with the reach diagram. If necessary, readjust according to instructions in
point "Adjustment of the outreach and overload limit switches".
After the above mentioned test loadings (case I and case II) and the subsequent inspection have been
completed without finding any defects in the structure or stability of the lift, the lift may be used inside
the permitted operating range presented in the reach/platform load diagram of this manual.
The max. allowed platform load is 215 kg
-
in conjunction with the first, i.e. start-up inspection, the lift shall be subjected to a test loading
with an overload of 25% and after that the supporting structures shall be thoroughly inspected
-
in conjunction with every annual inspection the lift shall be subjected to a test run with
maximum permissible load and after that the supporting structures shall be thoroughly inspected
-
the first inspection shall be recorded in the start-up inspection protocol and the test-run shall be
recorded in the protocols for the annual and regular inspection
Содержание 240RXT
Страница 2: ...DINO 240RXT 2...
Страница 3: ...DINO 240RXT 3 ORIGINAL OPERATING INSTRUCTIONS Valid from serial number 24040...
Страница 7: ...DINO 240RXT 7 2 REACH DIAGRAM...
Страница 8: ...DINO 240RXT 8 3 DIMENSION DRAWING...
Страница 18: ...DINO 240RXT 18 S20 S18 S17 S19 S16 Q2 H6 H3 S30 S13 S1 OK2...
Страница 20: ...DINO 240RXT 20 OK1 Q1 S11 S12 S31 S26 MDM S25 S22 S23 S24 S21 F13 S29 S27 S4 H1 H5 AD H4 LX A1 LX A0 PR...
Страница 36: ...DINO 240RXT 36 Notes...
Страница 39: ...DINO 240RXT 39 17 3 LUBRICATION PLAN...
Страница 41: ...DINO 240RXT 41 1...
Страница 58: ...DINO 240RXT 58 Notes...
Страница 60: ...DINO 240RXT 60 18 2 SAMPLE OF INSPECTION PROTOCOL FOR THE ACCESS PLATFORM...
Страница 61: ...DINO 240RXT 61...
Страница 83: ...DINO 240RXT 83 21 ELECTRIC DIAGRAM 24021...
Страница 84: ...DINO 240RXT 84...
Страница 85: ...DINO 240RXT 85...
Страница 86: ...DINO 240RXT 86...
Страница 87: ...DINO 240RXT 87...
Страница 88: ...DINO 240RXT 88...
Страница 89: ...DINO 240RXT 89...
Страница 90: ...DINO 240RXT 90...
Страница 91: ...DINO 240RXT 91...
Страница 92: ...DINO 240RXT 92...
Страница 93: ...DINO 240RXT 93...
Страница 94: ...DINO 240RXT 94...
Страница 95: ...DINO 240RXT 95...
Страница 96: ...DINO 240RXT 96...
Страница 97: ...DINO 240RXT 97...
Страница 98: ...DINO 240RXT 98...
Страница 99: ...DINO 240RXT 99...
Страница 100: ...DINO 240RXT 100...
Страница 101: ...DINO 240RXT 101...
Страница 102: ...DINO 240RXT 102...
Страница 103: ...DINO 240RXT 103...
Страница 104: ...DINO 240RXT 104...
Страница 105: ...DINO 240RXT 105...
Страница 106: ...DINO 240RXT 106...
Страница 107: ...DINO 240RXT 107 Notes...
Страница 110: ...DINO 240RXT 110 24 HYDRAULIC DIAGRAM BOOM OPERATION No 24013...
Страница 112: ...DINO 240RXT 112 26 HYDRAULIC DIAGRAM BOOM OPERATION WITH OPTIONAL EQUIPMENT No 24010...
Страница 113: ...DINO 240RXT 113 Notes...