DINO 240RXT
11
5 GENERAL SAFETY REGULATIONS
Make yourself familiar with these operation instructions before using the lift!
-
Keep these operating instructions in the place reserved for them.
-
Make sure that all users of the lift are familiar with these instructions.
-
Advice the new users and strictly follow all instructions given by the manufacturer.
-
Make sure you clearly understand all instructions relating to the operational safety of the lift.
Always use chocks under the wheels when leaving the lift on a gradient.
Only specially trained personnel with authorisation in writing from the employer who are well
familiarised with the device and at least 18-years old are allowed to operate the lift
-
The max. allowed load on the platform is two (2) persons and at maximum fifty five (55) kg of
additional load, however, the total load must not exceed two hundred fifteen (215) kg.
-
The platform may only be operated when the chassis is well supported and the wheels are off the
ground.
-
The load-bearing capacity and the gradient of the base must be taken into account when supporting
the chassis.
-
Additional support plates of adequate size must be used under the outriggers when working on soft
ground.
Only use such additional support plates on which the metallic outriggers will not slide.
-
The weather conditions, such as wind, visibility and rain, must always be taken into account so that
these factors will not adversely affect the safe performance of the lifting operations.
The use of the lift is prohibited if
-
the temperature drops under - 20 °C
or
-
the wind speed exceeds 12.5 m/s
PROTECT YOUR HEARING WHILE USING THE POWER UNIT 91 dB
USE THE SAFETY HARNESS!
Connecting points
for the safety
harness.
1 person/lug
Содержание 240RXT
Страница 2: ...DINO 240RXT 2...
Страница 3: ...DINO 240RXT 3 ORIGINAL OPERATING INSTRUCTIONS Valid from serial number 24040...
Страница 7: ...DINO 240RXT 7 2 REACH DIAGRAM...
Страница 8: ...DINO 240RXT 8 3 DIMENSION DRAWING...
Страница 18: ...DINO 240RXT 18 S20 S18 S17 S19 S16 Q2 H6 H3 S30 S13 S1 OK2...
Страница 20: ...DINO 240RXT 20 OK1 Q1 S11 S12 S31 S26 MDM S25 S22 S23 S24 S21 F13 S29 S27 S4 H1 H5 AD H4 LX A1 LX A0 PR...
Страница 36: ...DINO 240RXT 36 Notes...
Страница 39: ...DINO 240RXT 39 17 3 LUBRICATION PLAN...
Страница 41: ...DINO 240RXT 41 1...
Страница 58: ...DINO 240RXT 58 Notes...
Страница 60: ...DINO 240RXT 60 18 2 SAMPLE OF INSPECTION PROTOCOL FOR THE ACCESS PLATFORM...
Страница 61: ...DINO 240RXT 61...
Страница 83: ...DINO 240RXT 83 21 ELECTRIC DIAGRAM 24021...
Страница 84: ...DINO 240RXT 84...
Страница 85: ...DINO 240RXT 85...
Страница 86: ...DINO 240RXT 86...
Страница 87: ...DINO 240RXT 87...
Страница 88: ...DINO 240RXT 88...
Страница 89: ...DINO 240RXT 89...
Страница 90: ...DINO 240RXT 90...
Страница 91: ...DINO 240RXT 91...
Страница 92: ...DINO 240RXT 92...
Страница 93: ...DINO 240RXT 93...
Страница 94: ...DINO 240RXT 94...
Страница 95: ...DINO 240RXT 95...
Страница 96: ...DINO 240RXT 96...
Страница 97: ...DINO 240RXT 97...
Страница 98: ...DINO 240RXT 98...
Страница 99: ...DINO 240RXT 99...
Страница 100: ...DINO 240RXT 100...
Страница 101: ...DINO 240RXT 101...
Страница 102: ...DINO 240RXT 102...
Страница 103: ...DINO 240RXT 103...
Страница 104: ...DINO 240RXT 104...
Страница 105: ...DINO 240RXT 105...
Страница 106: ...DINO 240RXT 106...
Страница 107: ...DINO 240RXT 107 Notes...
Страница 110: ...DINO 240RXT 110 24 HYDRAULIC DIAGRAM BOOM OPERATION No 24013...
Страница 112: ...DINO 240RXT 112 26 HYDRAULIC DIAGRAM BOOM OPERATION WITH OPTIONAL EQUIPMENT No 24010...
Страница 113: ...DINO 240RXT 113 Notes...