Operation & Maintenance Manual
Section5-Operation Instruction
Dingli Machinery
5-5
5.3
Engine Operation
NOTE:
Initial starting should always be performed from the Ground Control station.
IF ENGINE FAILS TO START PROMPTLY, DO NOT CRANK FOR AN
EXTENDED TIME. SHOULD ENGINE FAIL TO START AGAIN,
ALLOW STARTER TO “COOL OFF” FOR 2-3 MINUTES. IF ENGINE
FAILS
AFTER
SEVERAL
ATTEMPTS,
REFER
TO
ENGINE
MAINTENANCE MANUAL.
NOTE: Diesel engines only: After turning on ignition, operator must wait until glow
plug indicator light goes out before cranking engine.
Starting Procedure
1)
Turn key of SELECT switch to GROUND. Position POWER/EMERGENCY STOP
switch to ON, then push the ENGINE START switch until engine starts.
ALLOW ENGINE TO WARM-UP FOR A FEW MINUTES AT LOW
SPEED BEFORE APPLYING ANY LOAD.
2)
After engine has had sufficient time to warm up, shut engine off.
3)
Turn SELECT switch to PLATFORM.
4)
From Platform, pull POWER/EMERGENCY STOP switch out, then push the ENGINE
START switch until engine starts.
NOTE: Footswitch must be in released (up) position before starter will operate. If starter
operates with footswitch in the depressed position, DO NOT OPERATE MACHINE.
Shutdown Procedure
IF AN ENGINE MALFUNCTION CAUSES AN UNSCHEDULED
SHUTDOWN, DETERMINE THE CAUSE AND CORRECT IT BEFORE
RESTARTING THE ENGINE
.
1)
Remove all loads and allow engine to operate at low speed for 3-5 minutes; this allows
further reduction of internal engine temperature.
2)
Push POWER/EMERGENCY STOP switch in.
3)
Turn MASTER switch to Off.
Refer to Engine Manufacturer’s manual for detailed information.
Содержание BA14J-AWD
Страница 1: ...Operation Maintenance Manual Table of Contents Dingli Machinery i Series 1 ...
Страница 51: ...Operation Maintenance Manual Section4 Machine Controls and Indicators Dingli Machinery 4 17 ...
Страница 52: ...Operation Maintenance Manual Section4 Machine Controls and Indicators Dingli Machinery 4 18 ...
Страница 53: ...Operation Maintenance Manual Section4 Machine Controls and Indicators Dingli Machinery 4 19 ...
Страница 66: ...Operation Maintenance Manual Section5 Operation Instruction Dingli Machinery 5 13 Figure 5 4 Tie Down Diagram ...
Страница 84: ...Operation Maintenance Manual Section8 Schematics Dingli Machinery 8 2 ...
Страница 85: ...Operation Maintenance Manual Section8 Schematics Dingli Machinery 8 3 ...
Страница 86: ...Operation Maintenance Manual Section8 Schematics Dingli Machinery 8 4 ...
Страница 87: ...Operation Maintenance Manual Section8 Schematics Dingli Machinery 8 5 ...
Страница 88: ...Operation Maintenance Manual Section8 Schematics Dingli Machinery 8 6 ...
Страница 89: ...Operation Maintenance Manual Section8 Schematics Dingli Machinery 8 7 ...
Страница 90: ...Operation Maintenance Manual Section8 Schematics Dingli Machinery 8 8 ...
Страница 91: ...Operation Maintenance Manual Section8 Schematics Dingli Machinery 8 9 ...
Страница 92: ...Operation Maintenance Manual Section8 Schematics Dingli Machinery 8 10 ...
Страница 93: ...Operation Maintenance Manual Section8 Schematics Dingli Machinery 8 11 ...
Страница 94: ...Operation Maintenance Manual Section8 Schematics Dingli Machinery 8 12 ...
Страница 95: ...Operation Maintenance Manual Section8 Schematics Dingli Machinery 8 13 ...
Страница 96: ...Operation Maintenance Manual Section8 Schematics Dingli Machinery 8 14 ...
Страница 97: ...Operation Maintenance Manual Section8 Schematics Dingli Machinery 8 15 ...