Operation & Maintenance Manual
Section5-Operation Instruction
Dingli Machinery
5-2
are variable from zero to maximum speed depending upon the position of the control lever.
Functions controlled by toggle switches are either on or off. A foot operated switch in the
platform must be depressed before any controls will function and provides a means of
emergency stop when the operator’s foot is removed from the footswitch.
The machine Lift is a two wheel drive or four wheel drive available machine with drive
power being supplied by a hydraulic motor for each drive wheel. Each drive wheel is supplied
with a hydraulically released, spring-applied brake. These brakes are automatically applied
any time the Drive Control lever is returned to the neutral position
The unrestricted capacity of the machine is 230 kg. This means that with a platform load of
230 kg or less, the platform may be positioned anywhere the boom will reach.
5.2
Operating Characteristics and Limitations
Capacities
The boom can be raised above horizontal with or without any load in platform, if:
1)
Machine is positioned on a smooth, firm and level surface.
2)
Load is within manufacturer’s rated capacity.
3)
All machine systems are functioning properly.
4)
Proper tire pressure( for pneumatic tire).
5)
Machine is as originally equipped from Dingli.
Stability
Machine stability is based on two (2) conditions which are called FORWARD and
BACKWARD stability. The machine’s position of least FORWARD stability is shown in (See
Figure5-1.), and its position of least BACKWARD stability is shown in (See Figure 5-2.)
TO AVOID FORWARD OR BACKWARD TIPPING, DO NOT OVERLOAD
MACHINE OR OPERATE THE MACHINE ON AN OUT-OF-LEVEL
SURFACE.
Содержание BA14J-AWD
Страница 1: ...Operation Maintenance Manual Table of Contents Dingli Machinery i Series 1 ...
Страница 51: ...Operation Maintenance Manual Section4 Machine Controls and Indicators Dingli Machinery 4 17 ...
Страница 52: ...Operation Maintenance Manual Section4 Machine Controls and Indicators Dingli Machinery 4 18 ...
Страница 53: ...Operation Maintenance Manual Section4 Machine Controls and Indicators Dingli Machinery 4 19 ...
Страница 66: ...Operation Maintenance Manual Section5 Operation Instruction Dingli Machinery 5 13 Figure 5 4 Tie Down Diagram ...
Страница 84: ...Operation Maintenance Manual Section8 Schematics Dingli Machinery 8 2 ...
Страница 85: ...Operation Maintenance Manual Section8 Schematics Dingli Machinery 8 3 ...
Страница 86: ...Operation Maintenance Manual Section8 Schematics Dingli Machinery 8 4 ...
Страница 87: ...Operation Maintenance Manual Section8 Schematics Dingli Machinery 8 5 ...
Страница 88: ...Operation Maintenance Manual Section8 Schematics Dingli Machinery 8 6 ...
Страница 89: ...Operation Maintenance Manual Section8 Schematics Dingli Machinery 8 7 ...
Страница 90: ...Operation Maintenance Manual Section8 Schematics Dingli Machinery 8 8 ...
Страница 91: ...Operation Maintenance Manual Section8 Schematics Dingli Machinery 8 9 ...
Страница 92: ...Operation Maintenance Manual Section8 Schematics Dingli Machinery 8 10 ...
Страница 93: ...Operation Maintenance Manual Section8 Schematics Dingli Machinery 8 11 ...
Страница 94: ...Operation Maintenance Manual Section8 Schematics Dingli Machinery 8 12 ...
Страница 95: ...Operation Maintenance Manual Section8 Schematics Dingli Machinery 8 13 ...
Страница 96: ...Operation Maintenance Manual Section8 Schematics Dingli Machinery 8 14 ...
Страница 97: ...Operation Maintenance Manual Section8 Schematics Dingli Machinery 8 15 ...