D-FORCE1400VA SLIDING GATE OPERATOR
damage can result from contact with any rough or sharp part.
Concrete
p ad
The base unit of the gate operator requires a concrete pad in order to
maintain proper stability. The concrete pad should be approximately
450mm x 300mm x 200mm deep in order to providing for adequate weight
and structure to insure proper stable installation.
Anchors
(see Fig.2)
You can use anchor bolts, anchors, washers and nuts. These anchors must
be set into the concrete when it is poured or you can use wedge anchors to
fasten the operator.
Gate operator
Gear
Groundsill
Input power
Plain washer
Nut
Spring washer
Nut
Fig.2
Ope
rator
b ase (see Fig.3)
After the concrete has hardened, mount the gate operator base to the
concrete pad. Verify that the base is properly leveled.
Using bolts and washers mount the gate operator to the base and insert the
cover. Check the operator and make sure it is lined up with the gate.