17
Commissioning Procedure for SAI TF2.5 (single speed) hydraulic motors.
8 COMMISIONING PROCEDURE
NOTE: BEFORE THE DRIVE UNIT IS EVEN CONNECTED TO THE EXCAVATOR ENSURE
THAT THE DRIVE IS FULL OF HYDRAULIC OIL AND THE GEARBOX IS FULL OF GEAR OIL.
All Digga planetary drive units are despatched from the factory full
of fluids
(hydraulic and gearbox oil) unless this warning decal is attached.
The decal is only applied in special circumstances, for example if a drive unit
needs to be air-freighted to the customer. Air transportation regulation prohibits
certain fluids from being air-freighted.
If there are no fluids in the drive unit at the time of despatching, then the decal
DE-000127 will be applied to the drive unit.
WARNING
FILL BEFORE USE
THIS UNIT HAS BEEN SHIPPED WITHOUT OIL
1.
Once you have determined if the drive unit has gearbox oil in or requires oil, ensure that the correct grade and quantity
of oil is installed. DO NOT RUN THE DRIVE UNIT WITHOUT OIL. Connect the hydraulic hoses to the excavator. If the
customer has ordered the optional Pressure Differential Kit and the Diggalign Kit, then there will be 2 electrical harness
to connect. When looking into the access hole in the hood, the hose to connect to the V1 port on the valve block or
manifold is the inlet hose (LHS). The hose to connect to V2 port of the valve block is the outlet hose (RHS). (See Diagram
on page 19 and page 20).
DE-0000127
Содержание PD 30 HP-7
Страница 1: ...1 OPERATORS MANUAL PD SD SINGLE SPEED HIGH POWERED DRIVES PM 000145...
Страница 2: ...2 PM 000145 PD SD HIGH POWERED PLANETARY DRIVE MANUAL MARCH 2019...
Страница 42: ...42 PM 000145 PD SD HIGH POWERED PLANETARY DRIVE MANUAL MARCH 2019 NOTES...
Страница 43: ...43 NOTES...
Страница 44: ...44 PM 000145 PD SD HIGH POWERED PLANETARY DRIVE MANUAL MARCH 2019 PM 000145...