19
CL3
Series
3.0
Installation
•
Burner Control Box Suspension
Burner Control Box Suspension
Suspending the burner control box must be done in accordance with applicable codes listed in the
Safety section and these instructions.
The burner control box must be in straight alignment with radiant tubes and level. Contact your local
distributor or the factory to see if your application allows for the rotation of the burner control box.
1
Determine the mounting chain locations for hanging the burner control box.
2
Fasten beam clamp, screw hook, or other type of suspension anchor to hanging point.
3
Attach S-hook and #1 double loop chain (P/N: THCS) to anchor. Check that it is securely connected.
4
Attach chain assemblies and S-hooks to mounting brackets on the burner control box. Adjust chain
lengths until level and in straight alignment with radiant tubes. Burner sight glass will be visible from the
floor.
Figure 3.12
•
Burner Control Box Assembly
- Side View
Figure 3.13
•
Burner Control Box Showing U-Shaped Configuration
- End View
Burner
Sight Glass
16” burner tube is in straight
alignment with combustion chamber
9.625”
16”
12.875”
4” Tube Clamp
(TP-21B)
Elongated
Hanger
(TP-19E)
4” Tube Clamp
(TP-21B)
1
2
3
4
32.5”
4.5”
8.625”
10.06”
5.31
18.5”
4”
11.25”
16”
Note:
Special consideration must be given when U-bend is
configured along the left side of the unit. Adequate spacing
must be provided for the service access panel.
Path of Access
Panel Door