13
CL3
Series
3.0
Installation
•
Hanger Placement and Suspension
2’ 4”
16” Burner
Tube
10’ x 5” CNG Combustion Tube with Liner (TP-26Q)
10’ x 4” Double-
Swaged Radiant Tube
(TP-26R)
8’ 10”
9’ 8”
9’ 8”
Burner
Control Box
Burner Control Box
Suspension Points
Igniter/
Sensor
Box
4” Tube Clamp
(TP-21B)
4” Tube Clamp (TP-21B)
4” Elongated Hanger (TP-19E)
5” Reflector Center Support (RCS) (TP-82C)
Suspension
Point
Suspension
Point
Suspension
Point
Chart 3.2
•
Heater Mounting Requirements and Weights
*
Refer to page 18 for U-bend configuration dimensions.
Model
Dimension
*
Str
aight
Configur
ation
Suspension
Points
Contr
ol Bo
x
Stabiliz
er
Shipping
W
eight
Chain Set Qt
y.
Str
aight
Optional Br
ass
Knuckle
(P
/N:BK
)
30 ft.
31’-5”
4
2
185
6
4
40 ft.
41’-1”
5
2
215
7
5
50 ft.
50’-9”
6
2
260
8
6
Figure 3.2
•
Heater Mounting Layout
NOTE:
A sticker identifying the combustion chamber(s) is located on the
swaged end of the tube(s).
4” Elongated
Reflector Center
Support (RCS)
(TP-82E)