Se nti
nel C X T
Sentinel CXT Instruction Manual
Rev. 1.7
Page 35 of 49
3. Re-Apply power to the unit. The controller will automatically format the card and create the
necessary files for data logging. Refer to Section 5.4.8 for more information regarding the data
logging feature.
6.3 R e pla ce m e ntofC onde nsa ti
onP re ve nti
onP a ck e t
On an annual or bi-annual basis, the Condensation Prevention packet should be exchanged with a new
packet. Remove the CXT Controller to a non-hazardous area and turn power OFF. Open hinged door and
locate packet. Remove packet and replace with a new packet in the same physical position. Close hinged
door and turn power ON.
6.4 R e pla ce m e ntofL i
thi
um IonB a tte ry P a ck (a nd C oi
nC e ll)
Warning
Explosion Hazard. Do not remove or replace the Lithium Ion Battery Pack unless
power has been disconnected or the area is known to be free of ignitable
concentrations of flammable gases or vapors.
Removal or replacement of the
Lithium Ion Battery Pack should only be done in a non-hazardous location.
1. If there are any warnings or fault indicators that suggest there is a problem with the lithium ion
battery pack (ie. not charging when expected), it should be removed and replaced. Relocate the
CXT Controller to a non-hazardous area and remove power from the CXT Controller by turning
the power switch to OFF. Open the hinged door to gain access to interior. Locate the four screws
that attach the metal bracket that secures the battery pack. Undo the four screws and set them aside
carefully.
Lift metal bracket and expose battery pack. Disconnect the two wire male/female
connector to free the pack. Replace the old pack with a new pack and reverse the directions given
above, making sure the wire connections are made correctly.
2. There is a small 3.0 VDC; 0.2 Amp-hr lithium ion coin cell located and soldered onto the Main
PCB that powers the clock. There is no expectation that the coin battery will ever need to be
replaced during the 12 year service lifetime of the product. If it is concluded that it does need
exchange, the unit must be returned to the Detcon Factory for replacement of the coin cell.
6.5 P rope r C le a ni
ng P roce dure
If the unit requires cleaning, take a clean water-damped wet cloth and wipe off the exterior surfaces of the
unit as required. Allow for air dry. It is
not
necessary to relocate the unit to a non-hazardous area to
perform cleaning.
6.6 Se rvi
ci
ng R i
sk s a nd V e ri
fi
ca ti
onofSa fe Sta te a fte r Se rvi
ci
ng
While performing any of the above-mention user-authorized service activities, proper caution shall be used
to avoid safety risks.
The first protective measure and mandatory requirement is that the CXT controller must be relocated to a
non-hazardous area while performing these functions.
Содержание SmartWireless CXT
Страница 6: ......
Страница 44: ...Sen ti n el C X T Sentinel CXT Instruction Manual Rev 1 7 Page 38 of 49...