Measurement of Board Test Points
You can measure board test points easily by turning over the main board while leaving it screwed to the back panel as
shown in the figure below.
DisassemblynProceduren(Seen"DISASSEMBLY"nforndetailsnonnthendisassemblynprocedure)
1. Remove all of the screws from the MAIN PCB, SMPS PCB, CD Mecha, CD Foot, NET PCB, USB PCB and chassis (CD Mecha
and CD Foot are for the RCD-N9 only).
2. Remove the SMPS PCB, CD Mecha and CD Foot (CD Mecha and CD Foot are for the RCD-N9 only).
3. Remove the molded parts from the back panel.
4. Raise the MAIN PCB, slide the entire back panel to the rear, and remove everything from the back panel to PCB as a set.
11
Содержание CEOL RCD-N9
Страница 34: ...Personal notes 34 ...
Страница 45: ...Personal notes 45 ...
Страница 77: ...TC7USB40MU NETWORK IC62 TC7USB40MU Block Diagram 77 ...