49
Installation Instructions for the Hybrid E5 Battery Storage System EU V1 EN 2018-09-17
P1E
1. Plug the CT cable into the CT connection on the
power meter.
P3E
P1E
2. Plug the CT cable into the plug of the measuring
sensors and lay the clamps for the measuring sen-
sors around the phase conductors (L for P1E; L1, L2
and L3 forP3E).
P3E
Connecting CT cable of the power meter
Содержание Hybrid E5
Страница 1: ...Hybrid E5 Battery Storage System Installation instructions Europe United Kingdom ...
Страница 58: ...58 Installation Instructions for the Hybrid E5 Battery Storage System EU V1 EN 2018 09 17 Space for notes ...
Страница 59: ...59 Installation Instructions for the Hybrid E5 Battery Storage System EU V1 EN 2018 09 17 Space for notes ...